|
Help
|
About
|
Sign Out
Home
Browse
Search
Dane County Code Of Ordinances
DaneCounty-Planning
>
Zoning
>
Dane County Code of Ordinances
>
1990's
>
1998
>
Dane County Code Of Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 11:31:25 AM
Creation date
11/18/2022 11:31:14 AM
Metadata
Fields
Template:
Planning Records
Document_Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
„==:14325) 53W <br /> (5) . Perform other duties as _specified in this (2) LCC staff refers to staff of the land <br /> ordinance. conservation committee as authorized under s. <br /> 92.09 of the Wisconsin Statutes. <br /> 14.33: INSPECTION AUTHORITY. The zoning -(3) .Plan means the erosion control plan required <br /> administrator is authorized to enter upon any lands by sec. 14.53.' <br /> affected by this ordinance in order to inspect such (4) Sensitive areas refers to lakes, perennially <br /> lands prior to or after permit issuance for the flowing streams, or wetlands regulated by Dane <br /> purpose of determining compliance with this County: <br /> ordinance. If permission cannot be received from (5): Soil loss rate means the rate at which, soil <br /> the applicant or permittee, entry by the zoning movement occurs as a result of sheet and rill <br /> administrator shall be according to.sections.66.122 erosion and does not apply to ditches or areas of <br /> and 66.123,Wis.Stats. concentrated.flows: <br /> . (6) No increase in surface water drainage means <br /> 14.34 ENFORCEMENT AUTHORITY. (1) The all calculated post-construction discharges from <br /> zoning administrator is authorized to post an order any regulated site for a two-year and a 10-year <br /> stopping work upon land which has had a permit storm .shall not be greater than pre-construction <br /> revoked or on land currently undergoing activity in peak discharges. Where permanent- on-site <br /> violation of this ordinance. Notice is given by.both detention is used for runoff control, the detention <br /> posting upon the land where the violation occurs facilities shall safely contain and/or safely pass the <br /> one or more copies of the poster stating the runoff of a 100-year storm of any duration: <br /> violation, and by mailing a copy of the order by (7) Site means the bounded area described in an <br /> certified mail to the person whose activity is in erosion control plan upon which regulated soil <br /> violation of this ordinance: This order shall specify disturbing activity takes place. <br /> that the activity must cease or be brought into [History: (4),(5),(6)and(7)cr.,Sub.4 to OA 27, 1993-94,pub. <br /> compliance within 30 days. 09/30/94;elf.01/01/95.] <br /> (2) Any permit revocation or order stopping work 14.52 LEGISLATIVE FINDING. The county board <br /> shall remain in effect until rescinded by the zoning of supervisors of Dane County finds that soil <br /> administratok, or a court of general jurisdiction; or erosion from land disturbing activities., and <br /> until the activity is brought into compliance with subsequent development can disturb natural cover <br /> the ordinance. The zoning administrator is and land surfaces resulting in a change in runoff <br /> authorized to refer any violation of this ordinance patterns that may have a detrimental effect on <br /> or of an order stopping work issued pursuant to - water quality and downstream uses; these <br /> this ordinance to the corporation counsel for activities and impacts .may cause damage to <br /> commencement of further legal proceedings. adjoining properties that should be strictly <br /> (14.35- 14.49 reserved for future use.] regulated. Further, effective sediment and storm <br /> water management depends upon proper planning, <br /> SUBCHAPTER II design and timely installation of conservation <br /> EROSION CONTROL SYSTEM practices as well as continuing maintenance <br /> practices. , <br /> [History: am:, Sub. 4 to OA 27, 1993-94, pub. 09130:94. ef. <br /> 14.50 AUTHORITY. 'Sections 14.50 through .. 01/01/95.] <br /> 14.57; inclusive,-are created under the authority of , . <br /> sec. 59.693 and sec. 33.455 of the Wisconsin 14.53 . APPLICABILITY OF REQUIREMENT'FOR <br /> Statutes. EROSION CONTROL PLANS. (1) . Any land <br /> [History: am.,Sub. 4 to OA 27, 1993-94, pub. 09/30/94, elf. disturbing activity occurring anywhere within the <br /> 01/01/95;am.,OA 49;1996-97,pub.07/18/97.] territorial limits of Dane County which involves a;; <br /> • <br /> 14.51. DEFINITIONS. As used in sections 14.52 area in excess of 4,000 square feet or involving <br /> - activity on a slope of greater than 12% grade <br /> through 14.57, inclusive, the following words have which may have off-site impacts, excluding <br /> the definitions indicated: agricultural activities or government highway <br /> (1) LCC means the Dane County Land construction, is subject to sections 14.51 through <br /> Conservation Committee created under sec. 92.06 14.99 of this ordinance to control off-site soil <br /> of the Wisconsin Statutes. transport. This provision shall not apply to <br /> Page 14-4 <br /> rev. 073197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.