Laserfiche WebLink
• <br /> 17-11 <br /> (3) COMMERCIAL USES: Any commercial permitted if they are floodproofed, in compliance <br /> structure or building which is to be erected, with s. 17.65,to the flood protection elevation; <br /> constructed, reconstructed, altered or moved into (b) Minor or auxiliary roads or nonessential <br /> the floodfringe area shall meet the requirements of utilities may be constructed at lower elevations <br /> s. 17.39(2). Storage yards, parking lots and other providing they withstand flood forces to the <br /> accessory structures or land uses may.be at lower regional flood elevation. <br /> elevations, subject to the requirements of sub. (5). (7) SEWAGE SYSTEMS. All on-site sewage <br /> However, no such area in general use by the disposal systems shall be floodproofed to the flood <br /> public shall be inundated to a.depth greater than protection elevation and shall meet the applicable <br /> two feet or subjected to flood velocities greater provisions of all local ordinances and ch. ILHR 83, <br /> than two feet per second during the regional flood. Wis.Adm. Code. <br /> Inundation of such yards or parking areas (8) WELLS. All public or private wells shall be <br /> exceeding two feet may be allowed provided an floodproofed to the flood protection elevation, <br /> adequate warning system exists to protect life and pursuant to s. 17.65, and shall meet the applicable <br /> property. provisions of.chs. NR 111 and NR 112, Wis. Adm. <br /> (4) MANUFACTURING AND INDUSTRIAL Code. <br /> USES. Any manufacturing or industrial structure or (9) SOLID WASTE DISPOSAL SITES. All public or <br /> building which is to be erected,- constructed, private solid or hazardous waste disposal sites are <br /> reconstructed, altered or moved into the prohibited in floodfringe areas. <br /> floodfringe area shall be protected to the flood (10) DEPOSITION OF MATERIALS. Any materials <br /> protection elevation utilizing fill, levees, deposited for any purpose may only be allowed if <br /> floodwalls, adequate flood proofing measures in all the provisions of this ordinance are met. <br /> accordance with s. 17.65, or any combination (11) MOBILE HOMES AND MANUFACTURED <br /> thereof. On streams or rivers having prolonged HOMES.1° (a) Owners or operators of all mobile <br /> flood durations, greater protection may be required home parks and subdivisions located in the <br /> to minimize interference with normal plant regional floodplain shall provide for adequate <br /> operations. A lesser degree of protection, surface drainage to minimize flood damage and <br /> compatible with the criteria in paras. (4) and (6), prepare, secure approval and file an evacuation <br /> may be permissible for storage yards, parking lots plan, indicating vehicular access and escape <br /> and other accessory structures or uses. routes, with the appropriate local emergency <br /> (5) STORAGE MATERIALS. The storage of management authorities. <br /> materials that are buoyant, flammable, explosive, (b) In existing mobile home parks,19 all new <br /> or which in times of flooding, could be injurious to homes with new pads, replacement units on <br /> property, water quality or human, animal, plant, existing pads, and substantially improved mobile <br /> fish or aquatic life, shall be at or above the flood homes and recreational vehicles that remain on-site <br /> protection elevation for the particular area or in excess of 180 days, or are unlicensed or not <br /> floodproofed in compliance with s. 17.65. ready for highway use and which are placed or <br /> Adequate measures shall be taken to assure that improved on a site located in the regional <br /> said materials will not enter the river or stream floodplain shall: <br /> during flooding. 1. have the lowest floor elevated to the regional <br /> (6) PUBLIC UTILITIES, STREETS AND BRIDGES. . flood elevation; and <br /> All utilities, streets and bridges should be designed . 2. be anchored so they do not float, collapse or <br /> to be compatible with the local comprehensive move laterally during a flood. <br /> floodplain development plans; and (c) Outside of existing mobile home parks, <br /> (a) When failure or interruption of public including new mobile home parks, and all single <br /> utilities, streets and bridges would result in danger units outside of existing parks, all new, <br /> to the public health or safety, or where such replacement and substantially improved mobile <br /> facilities are essential to the orderly functioning of homes and recreational vehicles that remain on-site <br /> the area, construction of and substantial more than 180 days, which are unlicensed or are <br /> improvements to such facilities may only be not ready for highway use, shall meet the <br /> 13 Annotation: Rev. federal rule Oct. 1990. <br /> 19 See 17.05(13). <br /> • rev. 043095 <br />