|
Help
|
About
|
Sign Out
Home
Browse
Search
Dane County Code Of Ordinances
DaneCounty-Planning
>
Zoning
>
Dane County Code of Ordinances
>
1990's
>
1998
>
Dane County Code Of Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 11:31:25 AM
Creation date
11/18/2022 11:31:14 AM
Metadata
Fields
Template:
Planning Records
Document_Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
17-15 <br /> (b) Legal description of the property, type of (h) An estimate of the cost of the proposal which <br /> proposed use and an indication as to whether new shall include all structural development, <br /> construction or a modification to an existing landscaping improvements, access and road <br /> structure is involved; and development, electrical and plumbing, and similar <br /> (c) SITE DEVELOPMENT PLAN. A site items reasonably applied to the overall <br /> development plan which shall be drawn to scale development costs, but need not include land <br /> and submitted as a part of the permit application . costs. <br /> form and which shall contain the following (3) The department will determine regional flood <br /> information: elevations and evaluate the proposal where the <br /> 1. Location, dimensions, area and elevation of applicant is not required to provide computations <br /> the lot; as above and inadequate data exists. The county <br /> 2. Location of the ordinary highwater mark of may transmit additional information, such as the <br /> any abutting navigable waterways; data in s. 17.44(2) where appropriate, to the <br /> 3. Location of any structures with distances• department with the request for analysis. <br /> measured from the lot lines and center line of all (4) EXPIRATION. All permits issued under the <br /> abutting streets or highways; authority of this ordinance shall expire one year <br /> 4. Location of any existing or proposed on-site from the date of issuance: <br /> sewage systems or private water supply systems; (5) CERTIFICATE OF COMPLIANCE. No land <br /> 5. Location and elevation of existing. or future shall be occupied or used, and no building which <br /> access roads; is hereafter constructed, altered, added to, <br /> 6. Location of floodplain and floodway limits on modified, rebuilt or replaced shall be occupied <br /> the property as determined from the official until a certificate of compliance is issued by the <br /> floodplain zoning maps; zoning administrator, except where no permit is <br /> 7. The elevation of the lowest floor of proposed required, subject to the following provisions: <br /> buildings and any fill using NGVD;23 (a) The certificate of compliance shall show that <br /> 8. Data sufficient to determine the regional flood the building or premises or part thereof, and the <br /> elevation in NGVD at the location of the proposed use, conform to the provisions of this <br /> development and to determine whether or not the ordinance. <br /> requirements of ss. 17.31 through 17.34 or ss. (b) Application for such certificate shall be made <br /> 17.37 through 17.39 are met; and at the same time as the application for a permit. <br /> 9. Data sufficient to determine if the proposed (c) The certificate of compliance shall be issued <br /> development will cause either an obstruction to within 10 days after written notification of <br /> flow or an increase in regional flood height or completion of the work specified in the permit, <br /> discharge according to s. 17.25. This may include provided the zoning administrator determines that <br /> any of the information noted in s. 17.33. the building or premises or proposed use conforms <br /> (d) DATA REQUIREMENTS TO ANALYZE with all the provisions of this ordinance. <br /> DEVELOPMENTS . 1. The applicant shall provide (d) The applicant shall submit a certification <br /> all survey data and computations sufficient to show signed by a registered professional engineer or <br /> .the effects of the project on flood heights, registered land surveyor that the fill, lowest floor <br /> velocities and floodplain storage for all subdivision and floodproofing elevations are in compliance <br /> proposals, as subdivision is defined in ch. 236, with the permit issued. Floodproofing measures <br /> Stets., and other proposed developments exceeding also require certification by a registered <br /> 5 acres in area or where the estimated cost exceeds professional engineer or registered architect that <br /> $125,000. floodproofing adequacy meets the requirements of <br /> (e) An analysis of the effect of the development s. 17.65. <br /> on the regional flood profile, velocity of flow and (6) OTHER PERMITS. The applicant must secure <br /> floodplain storage capacity. all other necessary permits from all appropriate <br /> (f) A map showing location and details of federal, state and local agencies, including those <br /> vehicular access to lands outside the floodplain. required by the U. S. Army Corps of Engineers <br /> (g) A surface drainage plan with adequate details under s.404 of the Federal Water Pollution <br /> showing how flood damage will be minimized. Control Act amendments of 1972, 33 U.S.C. 1334. <br /> 23 See the definition of NGVD at s. 17.05(38). <br /> rev. 043095 <br />
The URL can be used to link to this page
Your browser does not support the video tag.