Laserfiche WebLink
10.194(5)— (10) <br /> J <br /> applicant. Collocation sites need not be subject conditional use permit may provide to the <br /> available on the tower as initially placed or committee the names of consultants which the <br /> constructed, provided that the tower will support permit holder believes are qualified to assist in <br /> at the specified minimum height the later addition resolving the issues before the committee. In <br /> of the required number of collocation sites. any event, where a dispute arises under this <br /> Notwithstanding the height and number of ordinance involving an applicant for a conditional <br /> collocation sites on the tower as initially placed use permit and the holder of a conditional use <br /> or constructed, the communication tower design permit hereunder, the committee may allocate <br /> approved and permitted under this ordinance consulting costs and expenses between the <br /> shall be for a tower of 150 feet in height and applicant and permit holder. <br /> shall include the required collocation sites. The (8) A conditional use permit shall not be <br /> holder of a permit under this section shall make required for collocation on an existing tower <br /> the collocation sites required hereunder available permitted under this section, provided the <br /> for the placement of technologically compatible collocated antenna array or equipment is similar <br /> antenna arrays and equipment upon contractual in size and function to that installed by the holder <br /> provisions which are standard in the industry and of the conditional use permit for the tower, does <br /> at prevailing market rates allowing the permit not significantly alter the appearance or <br /> holder to recoup the cost of providing the structural integrity of the tower approved and <br /> collocation sites and a fair return on investment. permitted under this section, and is fully in <br /> (6) Unless otherwise provided herein, a compliance with all conditions contained in the <br /> conditional use permit is required for any original conditional use permit The holder of the <br /> modification of a communication tower which conditional use permit for any tower on which <br /> significantly alters the appearance or structural collocation occurs shall within 30 days of such <br /> integrity of the tower or which involves the collocation provide the •committee with written <br /> installation of antenna or equipment differing in notification of the identity of the collocator and <br /> size and function from that previously installed the nature of the equipment installed. Within 30 <br /> on the tower. The committee shall apply the days of the date on which any collocated use <br /> standards under section 10.255(2), D. C. Ords., ceases, the permit holder shall provide the <br /> when considering an application for conditional committee with written notice of the cessation of <br /> use permit to allow the modification of an such use. <br /> existing communication tower.• In addition, the (9) The holder of a conditional use permit for a <br /> committee shall consider the reasonableness, tower and any user collocating under this <br /> based on economic and technological feasibility, ordinance shall each be permitted to construct a <br /> of conditioning the grant of the conditional use building of no more than 14 feet in height and <br /> permit •upon modifying the tower in a manner 314 square feet in floor area for use directly <br /> which would accommodate the collocation of one incidental and necessary to the use of the tower. <br /> or more additional antenna arrays. Two or more users of the tower may build a <br /> (7) Upon written inquiry by the committee the single building with a floor area of no more than <br /> recipient of a conditional use•permit under this -314 square feet per user sharing the building. <br /> section shall have the burden of presenting Buildings constructed or used by tower <br /> credible evidence establishing to a reasonable collocators shall .be subject to conditions <br /> certainty the continued compliance with all established for the conditional use permit for the <br /> conditions placed upon the, conditional use tower. <br /> permit. Failure to establish compliance with all (10) Conditional use permits issued hereunder <br /> . conditions placed upon the conditional use shall identify the primary type or types of <br /> permit shall be grounds for revocation of the transmission equipment which is to be placed on <br /> permit. In the event the committee determines the subject communication tower. Any <br /> that it is necessary to consult with a third party to communication tower on which the transmission <br /> ascertain compliance with conditions on a equipment so identified is no longer placed or <br /> conditional use permit, all reasonable costs and used for a continuous period of 12 months shall, <br /> expenses associated with such consultation shall upon notification by the committee, be removed <br /> be borne by the holder of the subject conditional by the holder of the conditional use permit issued <br /> use permit. Failure to pay such costs and under this section. If the tower is not removed <br /> expenses or provide information requested by within 60 days of such notification, the county <br /> the committee shall be grounds for revocation of may remove the tower at the expense of the <br /> the conditional use permit The holder of the holder of the conditional use permit. <br /> Page 10-39 • <br /> rev. 103100 <br />