|
Help
|
About
|
Sign Out
Home
Browse
Search
Dane County Code Of Ordinances
DaneCounty-Planning
>
Zoning
>
Dane County Code of Ordinances
>
2000's
>
2002
>
Dane County Code Of Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 11:51:48 AM
Creation date
11/18/2022 11:51:33 AM
Metadata
Fields
Template:
Planning Records
Document_Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10.25(1)(a) — (3)(a)1. <br /> ordinance at reasonable hours for the purpose of issuance of a zoning permit. The zoning <br /> inspection. The zoning administrator shall hold administrator shall not be responsible for <br /> his or her office under civil service, and determining the location of lot lines. <br /> vacancies in such office shall be filled by (d) Application for a permit must contain the <br /> procedures established by civil service following: name and address of the owner of the <br /> ordinance. The county executive shall be the property, legal description, size and location of <br /> appointing authority for the position of zoning the building to be erected or moved on or onto <br /> administrator. the property, proposed use of the building or <br /> (b) It shall be the duty of the zoning premises, type of construction, estimated cost <br /> administrator to receive applications for zoning and any other information as the zoning <br /> permits and such other permits and licenses administrator may require. <br /> provided in this ordinance, and to issue such (e) This application shall be signed by the <br /> permits after applications have been examined owner or his or her duly authorized <br /> and approved; to inspect buildings under representative or agent; provided, however, that, <br /> construction for compliance with the regulations if a prospective owner desires a prior ruling on a <br /> of this ordinance; to make periodic inspections; proposed construction or use before <br /> to take such action as may be necessary for the consummation of purchase, he or she may apply <br /> enforcement of the regulations provided herein; for a permit, and, if a permit be denied, he or she <br /> to attend all meetings of the zoning committee ' may appeal to the board of adjustment. <br /> and the board of adjustment and to perform (f) Coincident with the issuing of a permit, the <br /> such other duties as the zoning committee and zoning administrator shall prepare a card <br /> the board of adjustment may direct. certifying that a permit has been issued. This <br /> (2) Zoning permits. (a) No new building shall card shall bear the same number as the permit <br /> hereafter be erected, and no existing building and identify the construction and premises <br /> shall be added to, structurally altered, moved or covered by the permit. This card shall be posted <br /> changed in use, nor shall any nonconforming in a conspicuous place on the premises during <br /> building be repaired or restored, in any district, the construction, and no construction shall be <br /> until a zoning permit has been issued, except as begun until this card has been posted. For <br /> otherwise provided by law or ordinance. purposes of this ordinance, start of construction <br /> (b) Permits shall not be required for accessory shall be when any earth disturbing activity takes <br /> farm buildings such as barns, sheds, silos and place that will lead to the installation of footings, <br /> the like when those buildings are used in the piers, posts, pilings or foundations. Earth <br /> operation of a farm, provided that the proposed disturbing activity for the purpose of soil <br /> building will not be located within a mapped flood evaluation or testing shall not be considered the <br /> plain or within a shoreland area and conforms to start of construction. <br /> all of the locational requirements of this (g) Each day a non-permitted structure, <br /> ordinance. If the proposed location of an building, addition, alteration or activity exists <br /> accessory farm building does not meet the shall constitute a separate violation. A non- <br /> locational requirements, a variance and a permit permitted structure, building, addition, alteration <br /> must be requested from the board of adjustment or activity is one which requires the issuance of a <br /> (c) An applicant for a zoning permit shall file a permit under this ordinance but which permit has <br /> development plan as defined in s. 10.01(19n). If . not been issued by the zoning administrator. <br /> from the development plan submitted by the (h) Any permit obtained through material <br /> applicant or based upon information gathered by misrepresentation shall be null and void. <br /> a zoning inspector, the zoning administrator (i) A permit issued pursuant to the provisions <br /> cannot determine compliance with the provisions of this section shall expire one year from the <br /> of county ordinances, the zoning administrator date of issuance if construction is not started <br /> may require the filing of a development plan within that time and will expire if construction <br /> prepared by a licensed surveyor. The zoning once started does not diligently proceed to <br /> administrator may also require evidence of completion within two years starting time. <br /> compliance with the Dane County Sanitary (3) Inspections of buildings to be made by the <br /> Code, the Dane County Land Division and zoning administrator. (a) 1. A location survey as <br /> Subdivision Ordinance, Dane County Trunk defined herein shall be submitted to the zoning <br /> Highway Access Control. Regulations or any division for all construction which will be located <br /> other state or township access or culvert permit less than 10' from required setback lines. The <br /> requirements as a condition precedent to the survey shall be done at the time when <br /> Page 10-42 <br /> rev. 103100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.