|
Help
|
About
|
Sign Out
Home
Browse
Search
Dane County Code Of Ordinances
DaneCounty-Planning
>
Zoning
>
Dane County Code of Ordinances
>
2000's
>
2006
>
Dane County Code Of Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 12:27:56 PM
Creation date
11/18/2022 12:27:42 PM
Metadata
Fields
Template:
Planning Records
Document_Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10.24 :10.25(2)(g) <br /> other pertinent sections of this ordinance ordinance. If the proposed location of an <br /> including nonconforming ("grandfathered") use or accessory farm building does not meet the <br /> locational status. locational requirements, a variance and a permit <br /> [History: (4)cr.,Sub.1 to OA 31, 1991-92,pub.04/22/92.] must be requested from the board of adjustment. <br /> (c) An applicant for a zoning permit shall file a <br /> 10.24 CHANGES AND AMENDMENTS. The development plan as defined in s. 10.01(19n). If <br /> Dane County Board of Supervisors may from from the development plan submitted by the <br /> time to time alter, supplement or change by applicant or based upon information gathered by <br /> ordinance the boundaries or classification of a zoning inspector, the zoning administrator <br /> districts designated in this ordinance, or any of cannot determine compliance with the provisions <br /> the provisions of regulations imposed by this of county ordinances, the zoning administrator <br /> ordinance in the manner provided by the law. may require the filing of a development plan <br /> prepared by a licensed surveyor. The zoning <br /> 10.25 ADMINISTRATION, ENFORCEMENT administrator may also require evidence of <br /> AND PENALTIES. (1) Zoning administrator. (a) compliance with the Dane County Sanitary <br /> The provisions of this ordinance shall be Code, the Dane County Land Division and <br /> administered by or under the zoning Subdivision Ordinance, Dane County Trunk <br /> administrator, who in person or by duly Highway Access Control Regulations or any <br /> authorized deputy or assistant shall have the other state or township access or culvert permit <br /> right to enter upon premises affected by this requirements as a condition precedent to the <br /> ordinance at reasonable hours for the purpose of issuance of a zoning permit. The zoning <br /> inspection. The zoning administrator shall hold administrator shall not be responsible for <br /> his or her office under civil service, and determining the location of lot lines. <br /> vacancies in such office shall be filled by (d) Application for a permit must contain the <br /> procedures established by civil service following: name and address of the owner of the <br /> ordinance. The county executive shall be the property, legal description, size and location of <br /> appointing authority for the position of zoning the building to be erected or moved on or onto <br /> administrator. the property, proposed use of the building or <br /> (b) It shall be the duty of the zoning premises, type of construction, estimated cost <br /> administrator to receive applications for zoning and any other information as the zoning <br /> permits and such other permits and licenses administrator may require. <br /> provided in this ordinance, and to issue such (e) This application shall be signed by the <br /> permits after applications have been examined owner or his or her duly authorized <br /> and approved; to inspect buildings under representative or agent; provided, however, that, <br /> construction for compliance with the regulations if a prospective owner desires a prior ruling on a <br /> of this ordinance; to make periodic inspections; proposed construction or use before <br /> to take such action as may be necessary for the consummation of purchase, he or she may apply <br /> enforcement of the regulations provided herein; for a permit, and, if a permit be denied, he or she <br /> to attend all meetings of the zoning committee may appeal to the board of adjustment. <br /> and the board of adjustment; and to perform (f) Coincident with the issuing of a permit, the <br /> such other duties as the zoning committee and zoning administrator shall prepare a card <br /> the board of adjustment may direct. certifying that a permit has been issued. This <br /> (2) Zoning permits. (a) No new building shall card shall bear the same number as the permit <br /> hereafter be erected, and no existing building and identify the construction and premises <br /> shall be added to, structurally altered, moved or covered by the permit. This card shall be posted <br /> changed in use, nor shall any nonconforming in a conspicuous place on the premises during <br /> building be repaired or restored, in any district, the construction, and no construction shall be <br /> until a zoning permit has been issued, except as begun until this card has been posted. For <br /> otherwise provided by law or ordinance. purposes of this ordinance, start of construction <br /> (b) Permits shall not be required for accessory shall be when any earth disturbing activity takes <br /> farm buildings such as barns, sheds, silos and place that will lead to the installation of footings, <br /> the like when those buildings are used in the piers, posts, pilings or foundations. Earth <br /> operation of a farm, provided that the proposed disturbing activity for the purpose of soil <br /> building will not be located within a mapped flood evaluation or testing shall not be considered the <br /> plain or within a shoreland area and conforms to start of construction. <br /> all of the locational requirements of this <br /> Page 10-44 <br /> rev. 103105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.