Laserfiche WebLink
12-1 <br /> 4 <br /> CHAPTER 12 machinery, site preparation, sewage disposal <br /> systems, utility lines and landscaping. <br /> - ZONING FEES [History: 12.04 am., Sub. 1 to OA 8, 1986-87, <br /> adopted 12-12-86; (1) am., OA 19, 1990-91, pub. <br /> ` 12.01 Title. 11/30/90.] <br /> 12.02 Authority. <br /> 1 12.03 Single Family and Duplex Residences. 12.05 PERMIT FEES. (2) The fee for a zoning <br /> 12.04 Agricultural Buildings. permit to place fill, grade or excavate in a flood <br /> 12.05 Permit Fees. plain area shall be $75.00. <br /> i 12.06 Exemptions From Fees. (3) The fee for a petition to amend the zoning <br /> 12.07 Disposition of Fees. ordinance shall be $100.00. <br /> 12.08 Permits And Fees. (4) The fee for a conditional use permit shall be <br /> $100.00. <br /> 12.01 TITLE. This Chapter may be cited as the (5) The fee for a variance $85.00. <br /> '' Dane County Zoning Fee Ordinance. (6) The fee for a certificate of compliance for <br /> _ buildings constructed prior to August 20, 1970, <br /> j 12.02 AUTHORITY. This Chapter is enacted and all other certificates provided for in chapter 10 <br /> under the authority of Section 59.07(16), (16m) shall be $10.00. <br /> and (68),Wis. Stats. (7) The fee for a salvage yard license or renewal <br /> --, shall be $30.00. <br /> i 12.03 SINGLE FAMILY AND DUPLEX (8) The fee for a petition to amend the zoning <br /> RESIDENCES. (1) For construction of new single ordinance and for a conditional use permit filed <br /> family and duplex residences the fee shall be jointly for the same parcel of land shall be <br /> ' $50.00 plus $0.035 for each square foot of floor $150.00. <br /> I area including basements and attached garages. (9) The fee for each zoning certificate under the <br /> (2) For additions to or alterations of existing single Wisconsin Farmland Preservation Act shall be <br /> family and duplex residences the fee shall be $10.00. <br /> 1 $50.00 plus $1.00 for each $1,000 or fraction (a) Whenever a farm is located in two townships <br /> thereof of construction costs. and two.certificates are required, only one fee shall <br /> (3). For construction, including additions or be charged. <br /> alterations, of commercial and multi-family (10) The fee for a special exception permit shall be <br /> structures, the fee shall be $100.00 plus $1.50 for $85.00. <br /> each $1,000 of construction cost or fraction [History: am., Sub. 1 to OA 8, 1986-87, ad. <br /> thereof, provided that the fee per $1,000 of 12-12-86; (8) and (9) rep., Sub. 2, OA 6, 1989-90, <br /> 1 . construction cost shall only apply to the first pub. 9/21/90; am. and (1), (11) and (12) rep., OA <br /> $1,000,000 of such cost. 19, 1990-91, pub. 11/30/90.] <br /> r- (4) Measurements are to be made using outside <br /> dimensions. When computed, the fee amount 12.06 EXEMPTIONS FROM• FEES. (1) The <br /> shall be rounded to the nearest dollar. following types of petitions and permits shall be <br /> _-. [History: am., Sub. 1, OA 8, 1986-87, adopted exempt from fees: <br /> 12-12-86; am., OA 19, 1990-91,'pub. 11/30/90.] (a) Petitions to amend the text of the ordinances <br /> when filed by a county board supervisor. <br /> 12.04 ALL OTHER BUILDINGS. (1) The fee for (b) Petitions to amend the zoning maps and <br /> I all new construction, alterations and additions to applications for conditional use permits, special <br /> existing buildings and buildings used for exception permits and variances if the land is <br /> agricultural purposes where a permit is required owned by a municipality and the governing body <br /> because of locational requirements of board of thereof submits the petition or applications. <br /> adjustment, except as provided in section 12.03, (c) Zoning permits for municipally owned <br /> shall be $50.00 plus $1.00 for each $1,000 or buildings. <br /> fraction thereof of construction costs. (d) Permits for construction or maintenance of <br /> r <br /> (2) Cost of construction shall include the cost of farm drainage ditches •and soil conservation <br /> mechanical equipment, but not including the cost practices in a flood plain area. <br /> of manufacturing or processing equipment or (e) On a one time basis, a town board may <br /> 1- petition to amend its zoning district maps for the <br /> printed 031795 . <br /> i , <br /> • <br />