|
.
<br /> 17-19
<br /> (5) Rezone from Flood Storage District to 2. The basement floor shall be at or above the
<br /> Floodfringe District. (a) . Department of Natural regional flood elevation, unless a community wide
<br /> Resources approval of any project that results in an exemption allowing flood proofing of basements
<br /> increase in the height of the regional flood shall be has been granted by the Federal Insurance
<br /> secured prior to the submitting of a petition to Administration (FR) of the Federal Emergency
<br /> rezone.. Management Agency(FEMA).
<br /> (b) The effect of rezoning from the flood storage (b) Commercial, Manufacturing and Industrial.
<br /> district to the flood fringe district shall be 1. Principal buildings which are to be erected,
<br /> calculated by comparing the current flood profile constructed, reconstructed, added to or moved into
<br /> ;.- . to the flood profile determined by assuming that a flood storage area shall be elevated or
<br /> the area to be rezoned is not available to store flood-proofed to two feet above the regional flood
<br /> flood water. elevation. Measures shall be taken to minimize
<br /> -- (c) The zoning maps for the flood storage interference with normal plant operations
<br /> district may not be amended without first especially for plants located on streams having
<br /> amending the applicable portions of the water protracted flood durations.
<br /> surface profiles and floodplain zoning ordinances 2. Storage yards, parking lots, airport landing
<br /> and securing the Department of Natural Resources strips and other similar accessory uses may be at
<br /> approval for such amendments. lower elevations, but, no such area for general use
<br /> (6) Determination of Flood Protection by the public shall be inundated to a depth greater
<br /> Elevations and Effects of Proposed Development than two feet or subjected to flood velocities
<br /> Upon Flood Heights, Velocity and Storage. (a) For greater than two feet per second.
<br /> all subdivision proposals, as defined in §236.02(8), (c) Storage or Processing. Materials that are
<br /> Statutes, and for other land divisions or proposed buoyant, flammable, explosive, or which in times
<br /> developments which have a total area that exceeds of flooding, could be injurious to human, animal,
<br /> 5 acres or which have an estimated cost that or plant life, shall be stored at or above the flood
<br /> exceeds $125,000, the applicant shall provide all protection elevation or flood proofed in
<br /> - the computations which are required to show the compliance with the provisions of this ordinance.
<br /> effect of the proposal on flood heights, velocities, (d) Utilities. Construction and substantial
<br /> and flood plain storage. improvements to utilities may be permitted
<br /> (b) For land divisions and proposed provided that they are flood proofed to the flood
<br /> developments which do not exceed 5 acres in area protection elevation.
<br /> and which have an estimated cost of $125,000 or (e) Sewage Systems. On-site sewage disposal
<br /> less, if the regional flood profile has not been systems shall be flood proofed to the flood
<br /> i ' determined, the municipality may transmit the protection elevation and shall meet the applicable
<br /> t information required to the Department of Natural provisions of local zoning ordinances and
<br /> Resources for a determination of flood protection Wisconsin Administrative Code ILHR 83.
<br /> elevations and for an evaluation of the effects of (f) Wells. Wells, whether public or private,
<br /> the proposal upon flood heights, velocities and shall be flood proofed to the flood protection
<br /> floodplain storage. elevation and shall meet the applicable provisions
<br /> -- (7) Permitted Uses in Flood Storage District. (a) of Chapter NR 111 and NR 112, Wisconsin
<br /> Residential: All residential structures shall meet Administrative Code.
<br /> the following standards: (g) Agricultural Uses. Including but not limited
<br /> 1. The first floor of a structure to be erected, to: general farming, pasture, grazing, outdoor plant
<br /> constructed, reconstructed, or moved on the flood nurseries, horticulture, viticulture, truck farming,
<br /> plain shall be constructed on fill at or above the forestry, sod farming and wild crop harvesting.
<br /> flood protection elevation for the particular area. (h) Private and Public Recreational Uses.
<br /> The fill shall be not less than one foot below the Including but not limited to: golf courses, tennis
<br /> flood protection elevation for the particular area courts, driving ranges, archery ranges, picnic
<br /> and the fill shall extend at such elevation at least grounds, boat launching ramps, swimming areas,
<br /> 15 feet beyond the limits of any structure or ' parks, wildlife and nature preserves, game farms,
<br /> building erected thereon and shall be contiguous fish hatcheries, shooting preserves, target ranges,
<br /> to land which is outside of the flood plain and/or is trap and skeet ranges, hunting and fishing areas,
<br /> accessible by rescue and relief vehicles during the hiking and horseback riding trails.
<br /> regional flood.
<br /> rev. 043095
<br />
|