|
Help
|
About
|
Sign Out
Home
Browse
Search
Dane County Code of Ordinances (2)
DaneCounty-Planning
>
Zoning
>
Dane County Code of Ordinances
>
1990's
>
1995
>
Dane County Code of Ordinances (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 1:15:13 PM
Creation date
11/18/2022 1:15:05 PM
Metadata
Fields
Template:
Planning Records
Document_Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
14-8 <br /> • IJ <br /> (2) Purpose. This ordinance serves as the this ordinance without first obtaining a permit for L. <br /> county erosion control ordinance for one- and that work from the zoning administrator. <br /> two-family dwelling construction consistent with (8) Permit Fee. The fee for review of a UDC ; <br /> the Wisconsin Uniform Dwelling Code ("UDC"). construction site erosion control plan shall be <br /> The county shall exercise jurisdiction for UDC made payable to the county zoning administrator � <br /> construction site erosion control by plan review, in the amount of $75.00 upon submittal of an <br /> permitting and inspections to promote public application. 5 <br /> health, safety and general welfare. (9) Violation and Penalties. (a) Orders. The 1 <br /> (3) Scope. This ordinance shall apply to all one- zoning administrator or his or her designee shall be <br /> and two-family dwellings whose initial empowered to issue written citations for violations <br /> construction is commenced hereafter and new of this ordinance. Violations shall be promptly j <br /> additions to pre-existing dwellings. The county corrected by the appropriate party. The zoning <br /> shall administer and enforce this ordinance in any administrator or his or her designee may also issue <br /> town, village or city within the County of Dane "stop work" orders at construction sites when soil <br /> which has not adopted the Wisconsin UDC as well disturbance and erosion occurs. Construction L <br /> as any municipality in the county which enters into activities may resume when the site is in <br /> ah intergovernmental cooperative agreement with compliance with UDC rules and the zoning I f <br /> Dane County pursuant to sec. 66.30, Wisconsin administrator or his or her designee authorizes L. <br /> Statutes, for this purpose. resumption of obstruction activities. The zoning <br /> (4) Adoption. Wisconsin Administrative Code administrator or designee shall inspect a site - <br /> Chapters ILHR 20 through 25 are hereby adopted subject to a "stop work" order to determine <br /> by reference, incorporated herein and made a part compliance with UDC rules within two (2) <br /> of this ordinance. Future amendments and working days after receiving a request from a <br /> revisions to the Wisconsin UDC or successor permittee or other appropriate party. �` { <br /> provisions relating to one-and two-family dwelling (b) Penalties. Any person who violates, neglects <br /> construction site erosion control are also made a or refuses to comply with or resists the <br /> part of this ordinance by reference to promote enforcement of any of the provisions of this <br /> statewide uniformity. Copies of the Wisconsin ordinance shall be subject to a civil forfeiture of <br /> UDC shall be kept on file in the offices of the not less than $25.00 nor more than $500.00, plus <br /> zoning administrator and county conservationist. costs of prosecution for each violation. An - <br /> (5) Enforcement. The county shall only unlawful violation includes failure to comply with I, I <br /> administer and enforce pertinent administrative any standard of this ordinance or with any <br /> and technical sections of the Wisconsin UDC condition or qualification attached to the erosion <br /> related to construction site erosion control control permit. Each day that a violation exists <br /> Lil <br /> measures and procedures (i.e., Ch. ILHR 20, shall be a separate offense. <br /> administration and enforcement, and s. ILHR [History: Cr., Sub. 2 to OA 3, 1994-95, pub. <br /> 21.125, technical requirements, Wis. Admin. 09/30/94,eff. 01/01/95.] <br /> Code)through this ordinance. <br /> (6) Zoning Administrator and County [14.61 - 14.70 reserved for future use.] <br /> Conservationist. The county's zoning r <br /> administrator and county conservationist, who 14.71 APPEALS. Under authority of chapter 68, I, <br /> shall be state certified inspectors pursuant to Wis. Stats., the Dane County Board of Adjustment, lY <br /> department of industry, labor and human relations created under section 59.99, Wis. Stats., and under <br /> requirements for this purpose, or other zoning and section 10.26 of the county zoning Ordinance, and i <br /> land conservation committee staff with appropriate acting as an appeal authority under. section <br /> state certified inspection status, shall administer 59.99(7)(a), Wis. Stats., is authorized to hear and <br /> this UDC construction site erosion control decide appeals where it is alleged that there is an r— <br /> ordinance. The zoning administrator shall error in any order, requirement, decision, or <br /> maintain all records related to UDC plan review, determination by the zoning administrator in --- <br /> permit and inspection activity for periodic DILHR administering this ordinance. <br /> reyiew and performance audits. <br /> (7) Permit Required. No person shall cause soil 14.72 PROCEDURE ON APPEALS. The rules, J <br /> to be disturbed for construction within the scope of procedures, duties, and powers of the board of <br /> rev. 103194 <br /> LIJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.