|
Help
|
About
|
Sign Out
Home
Browse
Search
Revised Dane County Code of Ordinances
DaneCounty-Planning
>
Zoning
>
Dane County Code of Ordinances
>
1990's
>
1995
>
Revised Dane County Code of Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 1:20:11 PM
Creation date
11/18/2022 1:20:03 PM
Metadata
Fields
Template:
Planning Records
Document_Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J <br /> Chapter 14 <br /> standard form approved by Dane County, wherever shall be referred to as the permittee who is . _I <br /> the following conditions exist: the site is not more responsible to the approving authority indicated in <br /> • than 20,000 square feet in area; the site is not sub. (1) to successfully complete the erosion control <br /> adjacent to and does not directly drain into any plan as proposed or consistent with an approved, <br /> sensitive areas nearby; and, there is a slope of less amended plan. The permittee shall be liable for any i <br /> than six percent(6%)throughout the site. and all costs incurred resulting from noncompliance ■ <br /> [History: cr., Sub. 4 to OA 27, 1993-94, pub. with an approved plan submitted by that party. <br /> 09/30/94,eff.01/01/95.] Within ten(10)days after completion of an approved 1 •' <br /> plan, where soil stabilization has been achieved, the <br /> 14.55 FILING OF EROSION CONTROL PLAN. permittee must notify the authority and the authority <br /> Any person applying for a zoning permit in any will then arrange an inspection to verify plan <br /> district subject to section 14.53 shall, as part of the compliance within ten (10) days after said <br /> zoning permit application process,submit an erosion notification. When a permittee acts to transfer an Li <br /> control plan meeting the requirements of section interest in property subject to an approved plan prior <br /> 14.54, or, if applicable, section 14.545. The zoning to completion of the proposed steps to attain soil —I <br /> administrator administrator and county conservationist shall stabilization, the permittee must secure approval <br /> review and make a determination as to any from the authority to transfer any portion of the —? <br /> adequately prepared plan submitted under section permittee's responsibility to the authority for the <br /> 14.54 within 10 working days for completeness and approved plan to another party. <br /> performance competency. Simplified plan checklists (4)All incidental mud-tracking off-site onto adjacent Li <br /> submitted pursuant to section 14.545 shall be public thoroughfares shall be immediately removed <br /> reviewed by the zoning administrator within two (2) using proper disposal methods. 1-Th <br /> working days for completeness and adequacy. A (5) As part of the plan approval process, the L <br /> zoning permit may not be issued if the plan is not zoning administrator shall establish a minimum <br /> submitted or is deficient in content. The issuance of number of inspections to be conducted. The site of <br /> a zoning permit shall be withheld pending approval any regulated land disturbing activity shall be <br /> of the plan. inspected at least once every 30 days during the lJ <br /> [History: am., Sub. 4 to OA 27, 1993-94, pub. active phase by the zoning administrator's staff with _ <br /> 09/30/94,eff.01/01/95.] the assistance of LCC staff. ' 1 <br /> (6) If the zoning administrator's inspections reveal _� <br /> 14.56 ADMINISTRATION AND any noncompliance with the plan, the zoning <br /> ENFORCEMENT administrator shall notify the owner and/or Li <br /> (1) The zoning administrator shall forward any site- contractor of all such specific instances of <br /> specific plan to the county conservationist for review noncompliance.The owner shall have 24 hours from - <br /> and approval. There shall be a site erosion control the time and date of notification by the zoning <br /> authority principally responsible for this review and administrator to correct any noncompliance with the <br /> approval process. This authority shall be comprised plan when notification is achieved in the following <br /> of the zoning administrator and the county manner: personal communication of noncompliance <br /> conservationist or their respective designees. LCC to owner and/or contractor or their respective agents; <br /> staff shall review the plan pursuant to the soil or, written notice sent by certified mail to owner ,_J <br /> conservation service Technical Guide as adopted by and/or contractor. The owner shall have 72 hours to <br /> Dane County and notify the zoning administrator of correct any noncompliance with the plan when r <br /> any deficiency in the proposed plan. County staff notification is achieved by either posting in a J <br /> engaged in this review and approval process shall be conspicuous place on the site a "noncompliance <br /> certified where appropriate by the Wisconsin notice card" or sending notice by facsimile <br /> Department of Industry,Labor and Human Relations transmission to owner and/or contractor. <br /> for this purpose. (7) The zoning administrator shall issue a citation <br /> (2) The zoning administrator shall inform the or a "stop work" order on the project covered by the _ <br /> applicant of any deficiency in the proposed plan and zoning permit if the project is not brought into <br /> the applicant shall correct any such deficiency in the compliance with the plan within 24 hours or 72 (_1 <br /> plan before the zoning permit is issued. hours respectively after notice under sub. (6) above. <br /> (3) The plan shall be implemented prior to the start Upon issuance of a "stop work" order, only <br /> of any land disturbing activity and shall be permittee's or an agent's efforts to achieve i <br /> ■ <br /> maintained as proposed throughout the entire term of compliance with the approved erosion control plan <br /> such activity. The applicant on an approved plan shall be permissible project activity. <br /> Page 66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.