Laserfiche WebLink
I- <br /> T <br /> Chapter 14 <br /> the county which enters into an intergovernmental shall inspect a site subject to a "stop work" order to . <br /> cooperative agreement with Dane County pursuant to determine compliance with UDC rules within two <br /> • sec.66.30,.Wisconsin Statutes,for this purpose. (2) working days after receiving a request from a —.1 <br /> (4) Adoption.Wis. Administrative Code Chapters permittee or other appropriate party. <br /> ILBR 20 through 25 are hereby adopted by (b)Penalties. Any person who violates, neglects or F <br /> reference, incorporated herein and made a part of refuses to comply with or resists the enforcement of 1 <br /> this ordinance. Future amendments and revisions to any of the provisions of this ordinance shall be <br /> the Wisconsin UDC or successor provisions relating subject to a civil forfeiture of not less than $25.00 <br /> to one- and two-family dwelling construction site nor more than$500.00, plus costs of prosecution for j <br /> Li <br /> erosion control are also made a part of this ordinance each violation. An unlawful violation includes <br /> by reference to promote statewide uniformity. failure to comply with any standard of this ordinance <br /> Copies of the Wisconsin UDC shall be kept on file in or with any condition or qualification attached to the <br /> the offices of the zoning administrator and county erosion control permit. Each day that a violation t_ '� <br /> conservationist, exists shall be a separate offense. <br /> (5) Enforcement. The county shall only administer [History: cr., Sub. 2 to OA 3, 1994-95, pub. <br /> and enforce pertinent administrative and technical 09/30/94,eff.01/01/95.] <br /> sections of the Wisconsin UDC related to <br /> construction site erosion control measures and [14.61-14.70 reserved for future use.] - <br /> procedures (i.e., Ch. ILHR 20, administration and <br /> enforcement, and s. ILHR 21.125, technical 14.71 APPEALS. Under authority of chapter 68, <br /> requirements, Wis. Admin. Code) through this Wis. Stats., the Dane County Board of Adjustment, <br /> ordinance, created under section 59.99, Wis. Stats., and under <br /> (6) Zoning Administrator and County section 10.26 of the county zoning Ordinance, and <br /> Conservationist. The county's zoning administrator acting as an appeal authority under section <br /> and county conservationist, who shall be state 59.99(7)(a), Wis. Stats., is authorized to hear and ,- <br /> certified inspectors pursuant to department of decide appeals where it is alleged that there is an <br /> industry,labor and human relations requirements for error in any order, requirement, decision, or L <br /> this purpose, or other zoning and land conservation determination by the zoning administrator in _ <br /> committee staff with appropriate state certified ministering this ordinance. <br /> inspection status, shall administer this UDC _� <br /> construction site erosion control ordinance. The 14.72 PROCEDURE ON APPEALS. The rules, <br /> zoning administrator shall maintain all records procedures, duties, and powers of the board of <br /> related to UDC plan review, permit and inspection adjustment and chapter 68,Wisconsin Statutes, shall i <br /> activity for periodic DILHR review and performance apply to this ordinance. <br /> audits. - <br /> � 1 <br /> (7) Permit Required. No person shall cause soil to 14.73 WHO MAY APPEAL. Appeals may be <br /> be disturbed for construction within the scope of this taken to the LCC by any person having a substantial, <br /> ordinance without first obtaining a permit for that material interest in an erosion control plan which is <br /> work from the zoning administrator. adversely affected by an order, requirement, <br /> (8) Permit Fee. The fee for review of a UDC decision, or determination made by the zoning _ <br /> construction site erosion control plan shall be made administrator. The LCC may adopt appropriate <br /> payable to the county zoning administrator in the written rules of procedure for this erosion control , 'i <br /> amount of$75.00 upon submittal of an application, plan appeals process. <br /> (9) Violation and Penalties. (a) Orders. The [History: am., Sub. 4 to OA 27, 1993-94, pub. <br /> zoning administrator or his or her designee shall be 09/30/94,eff.01/01/95.] <br /> empowered to issue written citations for violations of <br /> this ordinance. Violations shall be promptly [14.74-14.80 reserved for future use.] <br /> corrected by the appropriate party. The zoning <br /> administrator or his or her designee may also issue 14.81 PENALTIES. <br /> "stop work" orders at construction sites when soil (1) Any person who violates, neglects, or refuses to _ <br /> disturbance and erosion occurs. Construction comply with or resists the enforcement of any of the <br /> activities may resume when the site is in compliance provisions of this ordinance relating to earthen v <br /> with UDC rules and the zoning administrator or his manure storage facilities shall be subject to a <br /> or her designee authorizes resumption of obstruction forfeiture of not less than $5.00 nor more than <br /> activities. The zoning administrator or designee $200.00,plus costs of prosecution for each violation. -' <br /> (._f <br /> Page 68 <br />