|
Chapter 10
<br /> (29) Salvage recycling center. A salvage definitions is applicable, the zoning administrator
<br /> recycling center is an area where waste or scrap shall designate the rear lot line.
<br /> materials are bought, sold, exchanged, stored, (36) Major repairs to motor vehicles. Repairs and
<br /> recycled, baled, packed, disassembled or handled, overhauling of motor or engine parts, drive train
<br /> including, but not limited to, motor vehicles, farm assemblies,braking systems, body and frame repairs
<br /> equipment, scrap iron and other metals, paper, rags, and replacements, refinishing and painting, and
<br /> rubber tires and bottles. A salvage recycling center wheel alignment
<br /> includes a motor vehicle wrecking or dismantling (36a) Lot, zoning. A parcel of land under single
<br /> yard, but does not include a solid waste recycling ownership occupied or intended to be occupied by
<br /> center as defined in s. 10.01(50). one main building, and buildings and uses
<br /> (30) Kennel. A kennel is any premise, or portion customarily accessory or incidental thereto,
<br /> thereof,where dogs, cats or other household pets are including such open spaces as are provided or are
<br /> maintained,boarded,bred or cared for, in return for intended to be used in connection therewith or are
<br /> remuneration,or are kept for the purpose of sale. required by the ordinance. A zoning lot may or may
<br /> (30a) Livestock Livestock shall include but is not not coincide with a lot of record.
<br /> limited to cows, sheep, goats, hogs, draft horses, (36g) Majority means more than one half of the
<br /> pleasure horses and ponies, mules and poultry. For pertinent total.
<br /> purposes of this ordinance 100 or more rabbits shall 36 Mineral Extraction. Quarrying or excavation
<br /> be considered livestock and subject to the regulations san
<br /> gul d, gravel, limestone, earth, soil or other
<br /> pertaining to the keeping of livestock mineral resources. This definition includes (when
<br /> (31) Lodging house. A building in which lodging done in connection with mineral extraction)
<br /> accommodations are provided by previous accessory uses such as washing, crushing and other
<br /> arrangements for definite periods of time to four (4) processing of the materials,the erection of structures
<br /> or more but not to exceed twelve(12)individuals not and the installation or storage, or both, of the
<br /> members of the family. necessary machinery and equipment used in the
<br /> (32) Lot. A parcel of land occupied or intended to mineral extraction operation. Production of asphalt ,,�
<br /> be occupied by one (1) building and its accessory or concrete is not to be considered part of a mineral 9`¢ .
<br /> building and uses, except as otherwise provided extraction operation.
<br /> herein. A lot may be a parcel designated in a plat or (a) The following uses are not part of a
<br /> described in a conveyance recorded in the office of mineral extraction operation: site preparation for
<br /> the register of deeds. No land included in any street, residential or commercial plats, construction or
<br /> highway or railroad right-of-way shall be included landscaping projects, soil conservation practices,
<br /> when computing area. stream, lake or shoreline protection, agricultural
<br /> (33) Lot depth. The lot depth is the mean land leveling projects if materials are not removed
<br /> horizontal distance between the front lot line and the from the property and similar uses.
<br /> rear lot line measured within the lot boundaries. (36n Mineral Extraction. Quarrying or excavation
<br /> (34) Lot width. Is the distance between the side !of sand, gravel, limestone, earth, soil or other
<br /> lot lines measured along a line that is parallel,to the mineral resources. This definition includes (when
<br /> front lot line at the required building setback line. done in connection with mineral .extraction)
<br /> On triangular or gored lots the lot width shall be \ accessory uses such as washing, crushing and other
<br /> measured along a line that is parallel to the chord of processing of the materials,the erection of structures
<br /> the arc of the front lot line at the required building and the installation or storage, or both, of the
<br /> setback line, the lot width at this point shall not be necessary machinery and equipment used in the
<br /> less than that required by the zoning district in mineral extraction operation. Production of asphalt
<br /> { which the lot is located. (See also building setback or concrete is not to be considered part of a mineral
<br /> line) extraction operation.
<br /> (35) Lot line, rear. The rear lot line shall mean (a) The following uses are not part of a
<br /> that lot line which is opposite and most distant from mineral extraction operation: site preparation for
<br /> the front lot line. In the case of an irregular, residential or commercial plats, construction or
<br /> triangular or goreshaped lot, a line ten (10) feet in landscaping projects, soil conservation practices,
<br /> length entirely within the lot, parallel to and most stream, lake or shoreline protection, agricultural
<br /> distant from the front lot line shall be considered to land leveling projects if materials are not removed
<br /> be the rear lot line for the purpose of determining from the property and similar uses.
<br /> depth of rear yard. In cases where none of these (36r) Mini-warehouse is a storage building
<br /> comprised of separate compartments each of which
<br /> Page 5
<br />
|