Laserfiche WebLink
r <br /> Chapter 12 <br /> site preparation, sewage disposal systems, utility lines <br /> and landscaping. <br /> CHAPTER 12 [History: 12.04 am.,Sub. 1 to OA 8, 1986-87,adopted <br /> 12-12-86;(1)am.,OA 19, 1990-91,pub. 11/30/90.] <br /> ZONING FEES <br /> 12.05 PERMIT FEES. <br /> 12.01 Title. (2) The fee for a zoning permit to place fill, grade or <br /> 12.02 Authority. excavate in a flood plain area shall be$75.00. <br /> 12.03 Single Family and Duplex Residences. (3) The fee for a petition to amend the zoning <br /> 12.04 Agricultural Buildings. ordinance shall be$100.00. <br /> 12.05 Permit Fees. (4) The fee for a conditional use permit shall be <br /> 12.06 Exemptions From Fees. $100.00. <br /> 12.07 Disposition of Fees. (5) The fee fora variance$85.00. <br /> 12.08 Permits And Fees. (6) The fee for a certificate of compliance for <br /> buildings constructed prior to August 20, 1970, and all <br /> 12.01 TITLE. This Chapter may be cited as the Dane other certificates provided for in chapter 10 shall be <br /> County Zoning Fee Ordinance. $10.00. <br /> (7) The fee fora salvage yard license or renewal shall <br /> { 12.02 AUTHORITY. This Chapter is enacted under be$30.00. <br /> c the authority of Section 59.07(16),(16m)and(68),Wis. (8) The fee for a petition to amend the zoning <br /> Stats. ordinance and for a conditional use permit filed jointly <br /> for the same parcel of land shall be$150.00. <br /> 12.03 SINGLE FAMILY AND DUPLEX (9) The fee for each zoning certificate under the <br /> RESIDENCES. Wisconsin Farmland Preservation Act shall be$10.00. <br /> (1) For construction of new single family and duplex (a)Whenever a farm is located in two townships <br /> residences the fee shall be$50.00 plus$0.035 for each and two certificates are required, only one fee shall be <br /> square foot of floor area including basements and charged. <br /> attached garages. (10) The fee for a special exception permit shall be <br /> (2) For additions to or alterations of existing single $85.00. <br /> family and duplex residences the fee shall be $50.00 [History: am., Sub. 1 to OA 8, 1986-87,ad. 12-12-86; <br /> plus $1.00 for each $1,000 or fraction thereof of (8) and (9) rep., Sub. 2, OA 6, 1989-90, pub. 9/21/90; <br /> construction costs. am. and(1), (11) and(12) rep., OA 19, 1990-91, pub. <br /> (3) For construction,including additions or alterations, 11/30/90.] <br /> of commercial and multi-family structures,the fee shall <br /> be $100.00 plus $1.50 for each $1,000 of construction 12.06 EXEMPTIONS FROM FEES. <br /> cost or fraction thereof;provided that the fee per$1,000 (1) The following types of petitions and permits shall be <br /> of construction cost shall only apply to the first exempt from fees: <br /> $1,000,000 of such cost (a) Petitions to amend the text of the ordinances <br /> (4) Measurements are to be made using outside when filed by a county board supervisor. <br /> dimensions. When computed, the fee amount shall be (b) Petitions to amend the zoning maps and <br /> rounded to the nearest dollar. applications for conditional use permits, special <br /> [History: am., Sub. 1, OA 8, 1986-87, adopted 12-12- exception permits and variances if the land is owned by <br /> 86;am.,OA 19, 1990-91,pub. 11/30/90.] a municipality and the governing body thereof submits <br /> the petition or applications. <br /> 12.04 ALL OTHER BUILDINGS. (c) Zoning permits for municipally owned <br /> (1) The fee for all new construction, alterations and buildings. <br /> additions to existing buildings and buildings used for (d) Permits for construction or maintenance of <br /> agricultural purposes where a permit is required because farm drainage ditches and soil conservation practices in <br /> of locational requirements of board of adjustment, a flood plain area <br /> except as provided in section 12.03,shall be$50.00 plus (e) On a one time basis, a town board may <br /> $1.00 for each$1,000 or fraction thereof of construction petition to amend its zoning district maps for the <br /> costs. purpose of implementing its land use plan without the <br /> + (2) Cost of construction shall include the cost of necessity of a filing fee. It shall be the responsibility of <br /> mechanical equipment, but not including the cost of the town board to notify owners of land that will be <br /> manufacturing or processing equipment or machinery, <br /> Page 61 <br /> r- <br /> I <br />