|
Help
|
About
|
Sign Out
Home
Browse
Search
Dane County Code of Ordinances
DaneCounty-Planning
>
Zoning
>
Dane County Code of Ordinances
>
1990's
>
1996
>
Dane County Code of Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 1:30:33 PM
Creation date
11/18/2022 1:30:22 PM
Metadata
Fields
Template:
Planning Records
Document_Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Chapter 14 <br /> (5) Perform other duties as specified in this (2) LCC staff refers to staff of the land conservation <br /> ordinance. committee as authorized under s. 92.09 of the <br /> Wisconsin Statutes. <br /> 14.33 INSPECTION AUTHORITY. The zoning (3) Plan means the erosion control plan required by <br /> administrator is authorized to enter upon any lands sec. 14.53. <br /> affected by this ordinance in order to inspect such (4) Sensitive areas refers to lakes, perennially <br /> lands prior to or after permit issuance for the flowing streams, or wetlands regulated by Dane <br /> purpose of determining compliance with this County. <br /> ordinance. If permission cannot be received from (5) Soil loss rate means the rate at which soil <br /> the applicant or permittee, entry by the zoning movement occurs as a result of sheet and rill erosion <br /> administrator shall be according to sections 66.122 and does not apply to ditches or areas of <br /> and 66.123,Wis. Stats. concentrated flows. <br /> (6) No increase in surface water drainage means <br /> 14.34 ENFORCEMENT AUTHORITY. all calculated post-construction discharges from any <br /> (1) The zoning administrator is authorized to post regulated site for a two-year and a 10-year storm <br /> an order stopping work upon land which has had a shall not be greater than pre-construction peak <br /> permit revoked or on land currently undergoing discharges. Where permanent on-site detention is <br /> activity in violation of this ordinance. Notice is used for runoff control, the detention facilities shall <br /> given by both posting upon the land where the safely contain and/or safely pass the runoff of a 100- <br /> violation occurs one or more copies of the poster year storm of any duration. <br /> stating the violation, and by mailing a copy of the (7) Site means the bounded area described in an <br /> order by certified mail to the person whose activity is erosion control plan upon which regulated soil <br /> in violation of this ordinance. This order shall disturbing activity takes place. <br /> specify that the activity must cease or be brought into [History: (4), (5), (6) and (7) cr., Sub. 4 to OA 27, <br /> compliance within 30 days. 1993-94,pub. 09/30/94,eff. 01/01/95.] <br /> (2) Any permit revocation or order stopping work <br /> shall remain in effect until rescinded by the zoning 14.52 LEGISLATIVE FINDING. The county <br /> administrator, or a court of general jurisdiction; or board of supervisors of Dane County finds that soil <br /> until the activity is brought into compliance with the erosion from land disturbing activities and <br /> ordinance. The zoning administrator is authorized subsequent development can disturb natural cover <br /> to refer any violation of this ordinance or of an order and land surfaces resulting in a change in runoff <br /> stopping work issued pursuant to this ordinance to patterns that may have a detrimental effect on water <br /> the corporation counsel for commencement of quality and downstream uses; these activities and <br /> further legal proceedings. impacts may cause damage to adjoining properties <br /> that should be strictly regulated. Further, effective <br /> [14.35-14.49 reserved for future use.] sediment and storm water management depends <br /> upon proper planning, design and timely installation <br /> Subchapter II of conservation practices as well as continuing <br /> Erosion Control System maintenance practices. <br /> [History: am., Sub. 4 to OA 27, 1993-94, pub. <br /> 14.50 AUTHORITY. Sections 14.50 through 09/30/94,eff. 01/01/95.] <br /> 14.57, inclusive, are created under the authority of <br /> sec. 59.974 and sec. 33.455(3) of the Wisconsin 14.53 APPLICABILITY OF REQUIREMENT <br /> Statutes. FOR EROSION CONTROL PLANS. <br /> [History: am., Sub. 4 to OA 27, 1993-94, pub. (1) Any land disturbing activity occurring anywhere <br /> 09/30/94, eff. 01/01/95.] within the territorial limits of Dane County which <br /> involves an area in excess of 4,000 square feet or <br /> 14.51 DEFINITIONS. As used in sections 14.52 involving activity on a slope of greater than 12% <br /> through 14.57, inclusive, the following words have grade which may have off-site impacts, excluding <br /> the definitions indicated: agricultural activities or government highway <br /> (1) LCC means the Dane County Land construction, is subject to sections 14.51 through <br /> Conservation Committee created under sec. 92.06 of 14.99 of this ordinance to control off-site soil <br /> the Wisconsin Statutes. transport. This provision shall not apply to <br /> construction sites regulated under the Wisconsin <br /> Uniform Dwelling Code ("UDC"); Dane County <br /> Page 66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.