|
Chapter 10
<br /> integral part of the institution, such related facilities described in a conveyance recorded in the office of
<br /> ' as laboratories, out-patient departments, training the register of deeds. No land included in any street,
<br /> facilities,central service facilities and staff offices. highway or railroad right-of-way shall be included
<br /> (27) Hotel. A building in which board and when computing area.
<br /> lodging are provided to the transient public for (33) Lot depth. The lot depth is the mean
<br /> compensation. horizontal distance between the front lot line and the
<br /> (28) Junk Garbage,waste, refuse,trash, any used rear lot line measured within the lot boundaries.
<br /> motor vehicle upon which no current license plate is (34) Lot width. Is the distance between the side
<br /> displayed, any inoperable motor vehicle, any used lot lines measured along a line that is parallel to the
<br /> tire or used motor vehicle part, and any scrap front lot line at the required building setback line.
<br /> material such as metal,paper,rags,cans or bottles. On triangular or gored lots the lot width shall be
<br /> (29) Salvage recycling center. A salvage measured along a line that is parallel to the chord of
<br /> recycling center is an area where waste or scrap the arc of the front lot line at the required building
<br /> materials are bought, sold, exchanged, stored, setback line, the lot width at this point shall not be
<br /> less than that required by the zoning district in
<br /> recycled, baled, packed, disassembled or handled, �l Y g
<br /> including, but not limited to, motor vehicles, farm which the lot is located. (See also building setback
<br /> equipment, scrap iron and other metals, paper, rags, line)
<br /> rubber tires and bottles. A salvage recycling center (35) Lot line, rear. The rear lot line shall mean
<br /> includes a motor vehicle wrecking or dismantling that lot line which is opposite and most distant from
<br /> yard, but does not include a solid waste recycling the front lot line. In the case of an irregular,
<br /> center as defined in s. 10.01(50). triangular or goreshaped lot, a line ten (10) feet in
<br /> (30) Kennel. A kennel is any premise, or portion length entirely within the lot, parallel to and most
<br /> ' thereof,where dogs, cats or other household pets are distant from the front lot line shall be considered to
<br /> maintained,boarded,bred or cared for, in return for be the rear lot line for the purpose of determining
<br /> remuneration,or are kept for the purpose of sale. depth of rear yard. In cases where none of these
<br /> (30a) Livestock Livestock shall include but is not definitions is applicable, the zoning administrator
<br /> limited to cows, sheep, goats, hogs, draft horses, shall designate the rear lot line.
<br /> --. pleasure horses and ponies, mules and poultry. For (36) Major repairs to motor vehicles. Repairs and
<br /> purposes of this ordinance 100 or more rabbits shall overhauling of motor or engine parts, drive train
<br /> be considered livestock and subject to the regulations assemblies,braking systems,body and frame repairs
<br /> pertaining to the keeping of livestock. and replacements, refinishing and painting, and
<br /> (30m) Location survey. As indicated in this wheel alignment.
<br /> ordinance refers to survey information prepared by a (36a) Lot, zoning. A parcel of land under single
<br /> licensed surveyor indicating the location of property ownership occupied or intended to be occupied by
<br /> — lines and building location distances from those one main building, and buildings and uses
<br /> property lines for the specific portions of the customarily accessory or incidental thereto,
<br /> building indicated in this ordinance. Such surveys including such open spaces as are provided or are
<br /> - are not required to provide all the parcel information intended to be used in connection therewith or are
<br /> set forth by Wisconsin Administrative Code Chapter required by the ordinance. A zoning lot may or may
<br /> A-# 7.02 Minimum Standards for Property Surveys not coincide with a lot of record.
<br /> item A-E 7.01 (2) but may exclude unnecessary (36g) Majority means more than one half of the
<br /> information as permitted in A-E 7.01 (2) and pertinent total.
<br /> provide only the information required by the zoning (36m) Mineral Extraction. Quarrying or excavation
<br /> ordinance but such information must comply with of sand, gravel, limestone, earth, soil or other
<br /> - the accuracy standard required by A-E 7.06 mineral resources. This definition includes (when
<br /> Measurements. done in connection with mineral extraction)
<br /> (31) Lodging house. A building in which lodging accessory uses such as washing, crushing and other
<br /> accommodations are provided by previous processing of the materials,the erection of structures
<br /> arrangements for definite periods of time to four (4) and the installation or storage, or both, of the
<br /> or more but not to exceed twelve(12)individuals not necessary machinery and equipment used in the
<br /> members of the family. mineral extraction operation. Production of asphalt
<br /> (32) Lot. A parcel of land occupied or intended to or concrete is not to be considered part of a mineral
<br /> be occupied by one (1) building and its accessory extraction operation.
<br /> building and uses, except as otherwise provided (a) The following uses are not part of a
<br /> herein. A lot may be a parcel designated in a plat or mineral extraction operation: site preparation for
<br /> Page 5
<br /> f
<br />
|