Laserfiche WebLink
Chapter 10 <br /> integral part of the institution, such related facilities described in a conveyance recorded in the office of <br /> ' as laboratories, out-patient departments, training the register of deeds. No land included in any street, <br /> facilities,central service facilities and staff offices. highway or railroad right-of-way shall be included <br /> (27) Hotel. A building in which board and when computing area. <br /> lodging are provided to the transient public for (33) Lot depth. The lot depth is the mean <br /> compensation. horizontal distance between the front lot line and the <br /> (28) Junk Garbage,waste, refuse,trash, any used rear lot line measured within the lot boundaries. <br /> motor vehicle upon which no current license plate is (34) Lot width. Is the distance between the side <br /> displayed, any inoperable motor vehicle, any used lot lines measured along a line that is parallel to the <br /> tire or used motor vehicle part, and any scrap front lot line at the required building setback line. <br /> material such as metal,paper,rags,cans or bottles. On triangular or gored lots the lot width shall be <br /> (29) Salvage recycling center. A salvage measured along a line that is parallel to the chord of <br /> recycling center is an area where waste or scrap the arc of the front lot line at the required building <br /> materials are bought, sold, exchanged, stored, setback line, the lot width at this point shall not be <br /> less than that required by the zoning district in <br /> recycled, baled, packed, disassembled or handled, �l Y g <br /> including, but not limited to, motor vehicles, farm which the lot is located. (See also building setback <br /> equipment, scrap iron and other metals, paper, rags, line) <br /> rubber tires and bottles. A salvage recycling center (35) Lot line, rear. The rear lot line shall mean <br /> includes a motor vehicle wrecking or dismantling that lot line which is opposite and most distant from <br /> yard, but does not include a solid waste recycling the front lot line. In the case of an irregular, <br /> center as defined in s. 10.01(50). triangular or goreshaped lot, a line ten (10) feet in <br /> (30) Kennel. A kennel is any premise, or portion length entirely within the lot, parallel to and most <br /> ' thereof,where dogs, cats or other household pets are distant from the front lot line shall be considered to <br /> maintained,boarded,bred or cared for, in return for be the rear lot line for the purpose of determining <br /> remuneration,or are kept for the purpose of sale. depth of rear yard. In cases where none of these <br /> (30a) Livestock Livestock shall include but is not definitions is applicable, the zoning administrator <br /> limited to cows, sheep, goats, hogs, draft horses, shall designate the rear lot line. <br /> --. pleasure horses and ponies, mules and poultry. For (36) Major repairs to motor vehicles. Repairs and <br /> purposes of this ordinance 100 or more rabbits shall overhauling of motor or engine parts, drive train <br /> be considered livestock and subject to the regulations assemblies,braking systems,body and frame repairs <br /> pertaining to the keeping of livestock. and replacements, refinishing and painting, and <br /> (30m) Location survey. As indicated in this wheel alignment. <br /> ordinance refers to survey information prepared by a (36a) Lot, zoning. A parcel of land under single <br /> licensed surveyor indicating the location of property ownership occupied or intended to be occupied by <br /> — lines and building location distances from those one main building, and buildings and uses <br /> property lines for the specific portions of the customarily accessory or incidental thereto, <br /> building indicated in this ordinance. Such surveys including such open spaces as are provided or are <br /> - are not required to provide all the parcel information intended to be used in connection therewith or are <br /> set forth by Wisconsin Administrative Code Chapter required by the ordinance. A zoning lot may or may <br /> A-# 7.02 Minimum Standards for Property Surveys not coincide with a lot of record. <br /> item A-E 7.01 (2) but may exclude unnecessary (36g) Majority means more than one half of the <br /> information as permitted in A-E 7.01 (2) and pertinent total. <br /> provide only the information required by the zoning (36m) Mineral Extraction. Quarrying or excavation <br /> ordinance but such information must comply with of sand, gravel, limestone, earth, soil or other <br /> - the accuracy standard required by A-E 7.06 mineral resources. This definition includes (when <br /> Measurements. done in connection with mineral extraction) <br /> (31) Lodging house. A building in which lodging accessory uses such as washing, crushing and other <br /> accommodations are provided by previous processing of the materials,the erection of structures <br /> arrangements for definite periods of time to four (4) and the installation or storage, or both, of the <br /> or more but not to exceed twelve(12)individuals not necessary machinery and equipment used in the <br /> members of the family. mineral extraction operation. Production of asphalt <br /> (32) Lot. A parcel of land occupied or intended to or concrete is not to be considered part of a mineral <br /> be occupied by one (1) building and its accessory extraction operation. <br /> building and uses, except as otherwise provided (a) The following uses are not part of a <br /> herein. A lot may be a parcel designated in a plat or mineral extraction operation: site preparation for <br /> Page 5 <br /> f <br />