|
Chapter 14
<br /> the county which enters into an intergovernmental shall inspect a site subject to a "stop work" order to
<br /> cooperative agreement with Dane County pursuant to determine compliance with UDC rules within two
<br /> sec. 66.30,Wisconsin Statutes,for this purpose. (2) working days after receiving a request from a
<br /> (4) Adoption.Wis. Administrative Code Chapters permittee or other appropriate party.
<br /> ILHR 20 through 25 are hereby adopted by (b)Penalties. Any person who violates, neglects or
<br /> reference, incorporated herein and made a part of refuses to comply with or resists the enforcement of
<br /> this ordinance. Future amendments and revisions to any of the provisions of this ordinance shall be
<br /> the Wisconsin UDC or successor provisions relating subject to a civil forfeiture of not less than $25.00
<br /> to one- and two-family dwelling construction site nor more than$500.00, plus costs of prosecution for
<br /> erosion control are also made a part of this ordinance each violation. An unlawful violation includes
<br /> by reference to promote statewide uniformity. failure to comply with any standard of this ordinance
<br /> Copies of the Wisconsin UDC shall be kept on file in or with any condition or qualification attached to the
<br /> the offices of the zoning administrator and county erosion control permit. Each day that a violation
<br /> conservationist. exists shall be a separate offense.
<br /> (5) Enforcement. The county shall only administer [History: cr., Sub. 2 to OA 3, 1994-95, pub. 1
<br /> and enforce pertinent administrative and technical 09/30/94,eff. 01/01/95.]
<br /> sections of the Wisconsin UDC related to
<br /> construction site erosion control measures and [14.61-14.70 reserved for future use.]
<br /> procedures (i.e., Ch. ILHR 20, administration and
<br /> enforcement, and s. ILHR 21.125, technical 14.71 APPEALS. Under authority of chapter 68,
<br /> requirements, Wis. Admin. Code) through this Wis. Stats., the Dane County Board of Adjustment,
<br /> ordinance. created under section 59.99, Wis. Stats., and under
<br /> (6) Zoning Administrator and County section 10.26 of the county zoning Ordinance, and
<br /> Conservationist. The county's zoning administrator acting as an appeal authority under section
<br /> and county conservationist, who shall be state 59.99(7)(a), Wis. Stats., is authorized to hear and
<br /> certified inspectors pursuant to department of decide appeals where it is alleged that there is an
<br /> industry, labor and human relations requirements for error in any order, requirement, decision, or
<br /> this purpose, or other zoning and land conservation determination by the zoning administrator in
<br /> committee staff with appropriate state certified administering this ordinance.
<br /> inspection status, shall administer this UDC
<br /> construction site erosion control ordinance. The 14.72 PROCEDURE ON APPEALS. The rules,
<br /> zoning administrator shall maintain all records procedures, duties, and powers of the board of
<br /> related to UDC plan review, permit and inspection adjustment and chapter 68, Wisconsin Statutes, shall
<br /> activity for periodic DILHR review and performance apply to this ordinance.
<br /> audits.
<br /> (7) Permit Required. No person shall cause soil to 14.73 WHO MAY APPEAL. Appeals may be
<br /> be disturbed for construction within the scope of this taken to the LCC by any person having a substantial,
<br /> ordinance without first obtaining a permit for that material interest in an erosion control plan which is
<br /> work from the zoning administrator. adversely affected by an order, requirement,
<br /> (8) Permit Fee. The fee for review of a UDC decision, or determination made by the zoning
<br /> construction site erosion control plan shall be made administrator. The LCC may adopt appropriate
<br /> payable to the county zoning administrator in the written rules of procedure for this erosion control
<br /> amount of$75.00 upon submittal of an application. plan appeals process.
<br /> (9) Violation and Penalties. (a) Orders. The [History: am., Sub. 4 to OA 27, 1993-94, pub.
<br /> zoning administrator or his or her designee shall be 09/30/94,eff. 01/01/95.]
<br /> empowered to issue written citations for violations of
<br /> this ordinance. Violations shall be promptly [14.74-14.80 reserved for future use.]
<br /> corrected by the appropriate party. The zoning
<br /> administrator or his or her designee may also issue 14.81 PENALTIES.
<br /> "stop work" orders at construction sites when soil (1) Any person who violates, neglects, or refuses to
<br /> disturbance and erosion occurs. Construction comply with or resists the enforcement of any of the
<br /> activities may resume when the site is in compliance provisions of this ordinance relating to earthen
<br /> with UDC rules and the zoning administrator or his manure storage facilities shall be subject to a
<br /> or her designee authorizes resumption of obstruction forfeiture of not less than $5.00 nor more than
<br /> activities. The zoning administrator or designee $200.00,plus costs of prosecution for each violation.
<br /> Page 70,
<br />
|