|
Help
|
About
|
Sign Out
Home
Browse
Search
March Dane County Code of Ordinances
DaneCounty-Planning
>
Zoning
>
Dane County Code of Ordinances
>
1990's
>
1996
>
March Dane County Code of Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 1:35:46 PM
Creation date
11/18/2022 1:35:35 PM
Metadata
Fields
Template:
Planning Records
Document_Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Chapter 10 <br /> 10.25 ADMINISTRATION, ENFORCEMENT evidence of compliance with the Dane County <br /> AND PENALTIES. Sanitary Code, the Dane County Land Division and <br /> (1)Zoning Administrator. Subdivision Ordinance, Dane County Trunk <br /> (a) The provisions of this ordinance shall be Highway Access Control Regulations or any other <br /> administered by or under the zoning administrator, state or township access or culvert permit <br /> who in person or by duly authorized deputy or requirements as a condition precedent to the issuance <br /> assistant shall have the right to enter upon premises of a zoning permit. The zoning administrator shall <br /> affected by this ordinance at reasonable hours for the not be responsible for determining the location of lot <br /> purpose of inspection. The zoning administrator lines. <br /> shall hold his office under civil service, and (d) Application for a permit must contain <br /> -- vacancies in such office shall be filled by procedures the following: name and address of the owner of the <br /> established by civil service ordinance. The county property, legal description, size and location of the <br /> executive shall be the appointing authority for the building to be erected or moved on or onto the <br /> position of zoning administrator. property, proposed use of the building or premises, <br /> (b) It shall be the duty of the zoning type of construction, estimated cost and any other <br /> administrator to receive applications for zoning information as the zoning administrator may require. <br /> permits and such other permits and licenses provided (e) This application shall be signed by the <br /> in this ordinance, and to issue such permits after owner or his or her duly authorized representative or <br /> applications have been examined and approved; to agent; provided, however, that, if a prospective <br /> inspect buildings under construction for compliance owner desires a prior ruling on a proposed <br /> with the regulations of this ordinance; to make construction or use before consummation of <br /> periodic inspections; to take such action as may be purchase,he or she may apply for a permit, and, if a <br /> necessary for the enforcement of the regulations permit be denied, he or she may appeal to the board <br /> provided herein;to attend all meetings of the zoning of adjustment. <br /> committee and the board of adjustment; and to (f) Coincident with the issuing of a permit <br /> perform such other duties as the zoning committee the zoning administrator shall prepare a card, <br /> and the board of adjustment may direct. certifying that a permit has been issued. This card <br /> (2) Zoning Permits. shall bear the same number as the permit and <br /> (a) No new building shall hereafter be identify the construction and premises covered by the <br /> erected, and no existing building shall be added to, permit. This card shall be posted in a conspicuous <br /> structurally altered, moved or changed in use, nor place on the premises during the construction, and <br /> shall any nonconforming building be repaired or no construction shall be begun until this card has <br /> restored, in all districts, until a zoning permit has been posted. For purposes of this ordinance, start of <br /> been issued, except as otherwise provided by law or construction shall be when any earth disturbing <br /> ordinance. activity takes place that will lead to the installation <br /> (b) Permits shall not be required for of footings, piers, posts, pilings or foundations. <br /> accessory farm buildings such as barns, sheds, silos Earth disturbing activity for the purpose of soil <br /> and the like when those buildings are used in the evaluation or testing shall not be considered the start <br /> operation of a farm, provided that the proposed of construction. <br /> building will not be located within a mapped flood (g) Each day a non-permitted structure, <br /> plain or within a shoreland area and conforms to all building, addition, alteration or activity exists shall <br /> of the locational requirements of this ordinance. If constitute a separate violation. A non-permitted <br /> the proposed location of an accessory farm building structure,building, addition, alteration or activity is <br /> does not meet the locational requirements,a variance one which requires the issuance of a permit under <br /> and a permit must be requested from the board of this ordinance but which permit has not been issued <br /> adjustment. by the zoning administrator. <br /> (c) An applicant for a zoning permit shall (h) Any permit obtained through material <br /> file a development plan as defined in s.10.01(19n). misrepresentation shall be null and void. <br /> If from the development plan submitted by the (I) A permit issued pursuant to the <br /> applicant or based upon information gathered by a provisions of this section shall expire one year from <br /> zoning inspector, the zoning administrator cannot the date of issuance if construction is not started <br /> determine compliance with the provisions of county within that time and will expire if construction once <br /> ordinances,the zoning administrator may require the started does not diligently proceed to completion <br /> filing of a development plan prepared by a licensed within two years starting time. <br /> surveyor. The zoning administrator may also require <br /> Page 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.