Chapter 12
<br /> site preparation, sewage disposal systems, utility lines
<br /> and landscaping.
<br /> CHAPTER 12 [History: 12.04 am.,Sub. 1 to OA 8, 1986-87,adopted
<br /> 12-12-86;(1)am.,OA 19,1990-91,pub. 11/30/90.]
<br /> ZONING FEES
<br /> 12.05 PERMIT FEES.
<br /> 12.01 Title. (2) The fee for a zoning permit to place fill, grade or
<br /> 12.02 Authority, excavate in a flood plain area shall be$75.00.
<br /> 12.03 Single Family and Duplex Residences. (3) The fee for a petition to amend the zoning
<br /> 12.04 Agricultural Buildings. ordinance shall be$100.00.
<br /> 12.05 Permit Fees. (4) The fee for a conditional use permit shall be
<br /> 12.06 Exemptions From Fees. $100.00.
<br /> 12.07 Disposition of Fees. (5) The fee for a variance$85.00.
<br /> 12.08 Permits And Fees. (6) The fee for a certificate of compliance for
<br /> buildings constructed prior to August 20, 1970, and all
<br /> 12.01 TITLE. This Chapter may be cited as the Dane other certificates provided for in chapter 10 shall be
<br /> County Zoning Fee Ordinance. $10.00.
<br /> (7) The fee for a salvage yard license or renewal shall
<br /> 12.02 AUTHORITY. This Chapter is enacted under be$30.00.
<br /> the authority of Section 59.07(16),(16m)and(68),Wis. (8) The fee for a petition to amend the zoning
<br /> Stats. ordinance and for a conditional use permit filed jointly
<br /> for the same parcel of land shall be$150.00.
<br /> 12.03 SINGLE FAMILY AND DUPLEX (9) The fee for each zoning certificate under the
<br /> RESIDENCES. Wisconsin Farmland Preservation Act shall be$10.00.
<br /> (1) For construction of new single family and duplex (a)Whenever a farm is located in two townships
<br /> residences the fee shall be$50.00 plus $0.035 for each and two certificates are required, only one fee shall be
<br /> square foot of floor area including basements and charged,
<br /> attached garages. (10) The fee for a special exception permit shall be
<br /> (2) For additions to or alterations of existing single $85.00.
<br /> family and duplex residences the fee shall be $50.00 [History: am.,Sub. 1 to OA 8, 1986-87,ad. 12-12-86;
<br /> plus $1.00 for each $1,000 or fraction thereof of (8) and (9)rep., Sub. 2, OA 6, 1989-90, pub. 9/21/90;
<br /> construction costs. am. and(1), (11) and(12)rep., OA 19, 1990-91,pub.
<br /> _ ; (3) For construction,including additions or alterations, 11/30/90.]
<br /> of commercial and multi-family structures,the fee shall
<br /> be$100.00 plus $1.50 for each $1,000 of construction 12.06 EXEMPTIONS FROM FEES.
<br /> cost or fraction thereof provided that the fee per$1,000 (1) The following types of petitions and permits shall be
<br /> of construction cost shall only apply to the first exempt from fees:
<br /> $1,000,000 of such cost. (a) Petitions to amend the text of the ordinances
<br /> (4) Measurements are to be made using outside when filed by a county board supervisor.
<br /> dimensions. When computed, the fee amount shall be (b) Petitions to amend the zoning maps and
<br /> rounded to the nearest dollar. applications for conditional use permits, special
<br /> [History: am., Sub. 1, OA 8, 1986-87, adopted 12-12- exception permits and variances if the land is owned by
<br /> !_ 86;am.,OA 19,1990-91,pub. 11/30/901 a municipality and the governing body thereof submits
<br /> the petition or applications.
<br /> 12.04 ALL OTHER BUILDINGS. (c) Zoning permits for municipally owned
<br /> (1) The fee for all new construction, alterations and buildings.
<br /> additions to existing buildings and buildings used for (d) Permits for construction or maintenance of
<br /> agricultural purposes where a permit is required because farm drainage ditches and soil conservation practices in
<br /> ( of locational requirements of board of adjustment, a flood plain area.
<br /> except as provided in section 12.03,shall be$50.00 plus (e) On a one time basis, a town board may
<br /> $1.00 for each$1,000 or fraction thereof of construction petition to amend its zoning district maps for the
<br /> costs. purpose of implementing its land use plan without the
<br /> (2) Cost of construction shall include the cost of necessity of a filing fee. It shall be the responsibility of
<br /> mechanical equipment, but not including the cost of the town board to notify owners of land that will be
<br /> j manufacturing or processing equipment or machinery,