|
Chapter 12
<br /> CHAPTER 12 manufacturing or processing equipment or
<br /> machinery, site preparation, sewage disposal systems,
<br /> ZONING FEES utility lines and landscaping.
<br /> [History: 12.04 am., Sub. 1 to OA 8, 1986-87, I
<br /> 12.01 Title. adopted 12-12-86; (1) am., OA 19, 1990-91, pub.
<br /> 12.02 Authority. 11/30/90.]
<br /> 12.03 Single Family and Duplex Residences.
<br /> 12.04 Agricultural Buildings. 12.05 PERMIT FEES. (2) The fee for a zoning
<br /> 12.05 Permit Fees. permit to place fill, grade or excavate in a flood plain
<br /> 12.06 Exemptions From Fees. area shall be$75.00.
<br /> 12.07 Disposition of Fees. (3) The fee for a petition to amend the zoning i
<br /> 12.08 Permits And Fees. ordinance shall be$100.00.
<br /> (4) The fee for a conditional use permit shall be
<br /> 12.01 TITLE. This Chapter may be cited as the $100.00.
<br /> Dane County Zoning Fee Ordinance. (5) The fee for a variance$85.00.
<br /> (6) The fee for a certificate of compliance for
<br /> 12.02 AUTHORITY. This Chapter is enacted under buildings constructed prior to August 20, 1970, and
<br /> the authority of Section 59.07(16), (16m) and (68), all other certificates provided for in chapter 10 shall
<br /> Wis. Stats. be$10.00.
<br /> (7) The fee for a salvage yard license or renewal
<br /> 12.03 SINGLE FAMILY AND DUPLEX shall be$30.00.
<br /> RESIDENCES. (1) For construction of new single (8) The fee for a petition to amend the zoning
<br /> family and duplex residences the fee shall be $50.00 ordinance and for a conditional use permit filed
<br /> plus $0.035 for each square foot of floor area jointly for the same parcel of land shall be$150.00.
<br /> including basements and attached garages. (9) The fee for each zoning certificate under the
<br /> (2) For additions to or alterations of existing single Wisconsin Farmland Preservation Act shall be
<br /> family and duplex residences the fee shall be $50.00 $10.00.
<br /> plus $1.00 for each $1,000 or fraction thereof of (a) Whenever a farm is located in two townships
<br /> construction costs. and two certificates are required,only one fee shall be
<br /> (3) For construction, including additions or charged.
<br /> alterations, of commercial and multi-family (10) The fee for a special exception permit shall be
<br /> structures, the fee shall be $100.00 plus $1.50 for $85.00.
<br /> each $1,000 of construction cost or fraction thereof, [History: am., Sub. 1 to OA 8, 1986-87, ad. 12-12-
<br /> provided that the fee per $1,000 of construction cost 86; (8) and (9) rep., Sub. 2, OA 6, 1989-90, pub.
<br /> shall only apply to the first$1,000,000 of such cost. 9/21/90; am. and (1), (11) and (12) rep., OA 19,
<br /> (4) Measurements are to be made using outside 1990-91,pub. 11/30/90.]
<br /> dimensions. When computed,the fee amount shall be
<br /> rounded to the nearest dollar. 12.06 EXEMPTIONS FROM FEES. (1) The
<br /> [History: am., Sub. 1, OA 8, 1986-87, adopted 12- following types of petitions and permits shall be
<br /> 12-86;am., OA 19, 1990-91,pub. 11/30/90.] exempt from fees:
<br /> (a) Petitions to amend the text of the
<br /> 12.04 ALL OTHER BUILDINGS. (1) The fee for ordinances when filed by a county board supervisor.
<br /> all new construction, alterations and additions to (b) Petitions to amend the zoning maps and
<br /> existing buildings and buildings used for agricultural applications for conditional use permits, special
<br /> purposes where a permit is required because of exception permits and variances if the land is owned
<br /> locational requirements of board of adjustment, by a municipality and the governing body thereof
<br /> except as provided in section 12.03, shall be $50.00 submits the petition or applications.
<br /> plus $1.00 for each $1,000 or fraction thereof of (c) Zoning permits for municipally owned
<br /> construction costs. buildings.
<br /> (2) Cost of construction shall include the cost of
<br /> mechanical equipment, but not including the cost of
<br /> Page 64
<br /> Revised 4-30-97
<br />
|