Laserfiche WebLink
Chapter 14 <br /> 14.57 VARIANCES AND APPEALS. (1) construction site erosion control measures and <br /> Variances and appeals from the requirements of procedures (i.e., Ch. ILHR 20, administration and <br /> sections 14.50 through 14.55 may be taken to the enforcement, and s. ILHR 21.125, technical <br /> LCC by an applicant, property owner or other person requirements, Wis. Admin. Code) through this <br /> with a substantial interest, within thirty (30) days ordinance. <br /> after the zoning administrator's erosion control plan (6) Zoning administrator and county <br /> determination. The LCC may only grant variances conservationist. The county's zoning administrator <br /> and appeal requests when a specific fmding is made and county conservationist, who shall be state <br /> of no damage to water quality. certified inspectors pursuant to department of <br /> [History: cr., sub. 2 to OA 10, 1987-88, pub. industry, labor and human relations requirements for <br /> 09/14/87; am., Sub. 4 to OA 27, 1993-94, pub. this purpose, or other zoning and land conservation <br /> 09/30/94,eff. 01/01/95.] committee staff with appropriate state certified <br /> inspection status, shall administer this UDC <br /> [14.58-14.59 reserved for future use.] construction site erosion control ordinance. The <br /> zoning administrator shall maintain all records related <br /> 14.60 ONE- AND TWO-FAMILY DWELLING to UDC plan review, permit and inspection activity <br /> EROSION CONTROL. (1) Authority. Section for periodic DILHR review and performance audits. <br /> 14.60 is adopted under the authority of sec. 59.07(51) (7) Permit required No person shall cause soil to <br /> and sec. 101.65 of the Wisconsin Statutes. be disturbed for construction within the scope of this <br /> (2) Purpose. This ordinance serves as the county ordinance without first obtaining a permit for that <br /> erosion control ordinance for one- and two-family work from the zoning administrator. <br /> dwelling construction consistent with the Wisconsin (8) Permit fee. The fee for review of a UDC <br /> Uniform Dwelling Code ("UDC"). The county shall construction site erosion control plan shall be made <br /> exercise jurisdiction for UDC construction site payable to the county zoning administrator in the <br /> erosion control by plan review, permitting and amount of one hundred ten dollars ($110.00) upon <br /> inspections to promote public health, safety and submittal of an application. <br /> general welfare. (9) Violation and penalties. <br /> (3) Scope. This ordinance shall apply to all one- (a) Orders. The zoning administrator or his <br /> and two-family dwellings whose initial construction or her designee shall be empowered to issue written <br /> is commenced hereafter and new additions to pre- citations for violations of this ordinance. Violations <br /> existing dwellings. The county shall administer and shall be promptly corrected by the appropriate party. <br /> enforce this ordinance in any town, village or city The zoning administrator or his or her designee may <br /> __ within the County of Dane which has not adopted the also.issue "stop work" orders at construction sites <br /> Wisconsin UDC as well as any municipality in the when soil disturbance and erosion occurs. <br /> county which enters into an intergovernmental Construction activities may resume when the site is in <br /> cooperative agreement with Dane County pursuant to compliance with UDC rules and the zoning <br /> sec.66.30,Wisconsin Statutes,for this purpose. administrator or his or her designee authorizes <br /> (4) Adoption. Wisconsin Administrative Code resumption of obstruction activities. The zoning <br /> Chapters ILHR 20 through 25 are hereby adopted by administrator or designee shall inspect a site subject <br /> reference, incorporated herein and made a part of this to a "stop work" order to determine compliance with <br /> ordinance. Future amendments and revisions to the UDC rules within two (2) working days after <br /> Wisconsin UDC or successor provisions relating to receiving a request from a permittee or other <br /> one- and two-family dwelling construction site appropriate party. <br /> ' erosion control are also made a part of this ordinance (b) Penalties. Any person who violates, <br /> , by reference to promote statewide uniformity. Copies neglects or refuses to comply with or resists the <br /> of the Wisconsin UDC shall be kept on file in the enforcement of any of the provisions of this <br /> offices of the zoning administrator and county ordinance shall be subject to a civil forfeiture of not <br /> conservationist. less than$25.00 nor more than$500.00,plus costs of <br /> (5) Enforcement. The county shall only prosecution for each violation. An unlawful violation <br /> administer and enforce pertinent administrative and includes failure to comply with any standard of this <br /> technical sections of the Wisconsin UDC related to ordinance or with any condition or qualification <br /> Page 73 <br /> I <br /> Revised 4-30-97 <br />