|
12.01 =12.06(1)(e)
<br /> CHAPTER 12 machinery, site preparation, sewage disposal
<br /> systems, utility lines and landscaping.
<br /> ZONING FEES [History: 12.04 am., Sub. 1 to OA 8, 1986-87, adopted
<br /> 12/12/86;(1)am.,OA 19, 1990-91,pub. 11/30/90.]
<br /> 12.01 Title. 12.05 PERMIT FEES. (2) The fee for a zoning
<br /> 12.02 Authority.
<br /> 12.03 Single Family and Duplex Residences. permit to place fill, grade or excavate in a flood
<br /> plain area shall be $75.00.
<br /> 12.04 All Other Buildings. _
<br /> (3) The fee for a petition to amend the zoning
<br /> 12.05 Permit Fees. ordinance shall be$165.00.
<br /> 12.06 Exemptions From Fees. (4) The fee for a conditional use permit shall be
<br /> 12.07 Disposition of Fees. $165.00.
<br /> 12.08 Permits And Fees. (5) The fee for a variance $85.00.
<br /> 12.01 TITLE. This chapter may be cited as the (6) The fee for a certificate of compliance for
<br /> Dane County Zoning Fee Ordinance. buildings constructed prior to August 20, 1970,
<br /> and all other certificates provided for in chapter 10
<br /> shall be $10.00.
<br /> 12.02 AUTHORITY. This chapter is enacted (7) The fee for a salvage yard license or renewal
<br /> under the authority of ss: 59.696 and 59.697, Wis. shall be $30.00.
<br /> Stats. (8) The fee for a petition to amend the zoning
<br /> [History: am.,OA 37, 1996-97,pub.03/14/97.] ordinance and for a conditional use permit filed
<br /> 12.03 SINGLE FAMILY AND DUPLEX jointly for the same parcel of land shall be
<br /> RESIDENCES. (1) For construction of new single $150.00.
<br /> family and duplex residences the fee shall be (9) The fee for each zoning certificate under the
<br /> $50.00 plus $0.035 for each square foot of floor Wisconsin Farmland Preservation Act shall be
<br /> area including basements and attached garages. $10.00.
<br /> (2) For additions to or alterations of existing (a) Whenever a farm is located in two townships
<br /> single family and duplex residences the fee shall be and two certificates are required, only one fee shall
<br /> $50.00 plus $1.00 for each $1,000 or fraction be charged.
<br /> thereof of construction costs. (10) The fee for a special exception permit shall be
<br /> (3) For construction, including additions or $85.00.
<br /> alterations, of commercial and multi-family 9)I rep., Sub. 2 to OA 6, 1989-90, pub.b. 09/21/90;t2am. and (1)
<br /> structures, the fee shall be $100.00 plus $1.50 for (11)and (12)rep.,OA 19,1990-91, pub. 11/30/90; (3)and(-)
<br /> each $1,000 of construction cost or fraction am.,OA 37, 1996-97,pub.03/14/97.]
<br /> thereof, provided that the fee per $1,000 of
<br /> construction cost shall only apply to the first 12.06 EXEMPTIONS FROM FEES. (1) The
<br /> $1,000,000 of such cost. following types of petitions and permits shall be
<br /> (4) Measurements are to be made using outside exempt from fees:
<br /> . dimensions. When computed, the fee amount (a) Petitions to amend the text of the ordinances
<br /> shall be rounded to the nearest dollar. when filed by a county board supervisor.
<br /> [History:am.,Sub. 1 to OA 8, 1986-87,adopted 12/12/86;am., (b) Petitions to amend the zoning maps and
<br /> OA 19, 1990-91,pub. 11/30/90.] applications for conditional use permits, special
<br /> exception permits and variances if the land is
<br /> 12.04 ALL OTHER BUILDINGS. (1) The fee for ,
<br /> owned by a municipality and the governing body
<br /> all new construction, alterations and additions to thereof submits the petition or applications.
<br /> existing buildings and buildings used for (c) Zoning permits for municipally owned
<br /> agricultural purposes where a permit is required buildings.
<br /> because of locational requirements of the board of (d) Permits for construction or maintenance of
<br /> adjustment, except as provided in section 12.03, farm drainage ditches and soil conservation
<br /> shall be $50.00 plus $1.00 for each $1,000 or practices in a flood plain area.
<br /> fraction thereof of construction costs. (e) On a one time basis, a town board may
<br /> (2) Cost of construction shall include the cost of petition to amend its zoning district maps for the
<br /> mechanical equipment, but not including the cost purpose of implementing its land use plan without
<br /> of manufacturing or processing equipment or the necessity of a filing fee. It shall be the
<br /> Page 12-1
<br /> rev. 043097
<br />
|