Laserfiche WebLink
10 - 35 <br /> permits and such other permits and licenses premises, type of construction, estimated cost and <br /> provided in this ordinance, and to issue such any other information as the zoning administrator <br /> permits after applications have been examined may require. <br /> and approved; to inspect buildings• under (e) This application shall be signed by the <br /> construction for compliance with the regulations owner or his or her duly authorized representative <br /> of this ordinance; to make periodic inspections; or agent; provided, however, that, if a prospective <br /> to take such action as may be necessary for the owner desires a prior ruling on a proposed <br /> enforcement of the regulations provided herein; construction or use before consummation of <br /> to attend all meetings of the zoning committee purchase, he or she may apply for a permit, and, if <br /> and the board of adjustment; and to perform a permit be denied, he Or she may appeal to the <br /> such other duties as the zoning committee and board of adjustment. <br /> the board of adjustment may direct. (f) Coincident with the issuing of a permit the <br /> (2) Zoning Permits. (a) No new building zoning administrator shall prepare a card, <br /> shall hereafter be erected, and no existing certifying that a permit has been issued. This card <br /> building shall be added to, structurally altered, shall bear the same number as the permit and <br /> moved or changed in use, nor shall any identify the construction and premises covered by <br /> nonconforming building be repaired or restored, the permit. This card shall be posted in a <br /> in all districts, until a zoning permit has been conspicuous place on the premises during the <br /> issued, except as otherwise provided by law or construction, and no construction shall be begun <br /> - - ordinance. until this card has been posted. For purposes of <br /> (b) Permits shall not be required for accessory this ordinance, start of construction shall be when <br /> farm buildings such as barns, sheds, silos and the any earth disturbing activity takes place that will <br /> like when those buildings are used in the lead to the installation of footings, piers, posts, <br /> operation of a farm, provided that the proposed pilings or foundations. Earth disturbing activity for <br /> building will not be located within a mapped the purpose of soil evaluation or testing shall not <br /> flood plain or within a shoreland area and be considered the start of construction. <br /> conforms to all of the locational requirements of (g) Each day a non-permitted structure, building, <br /> this ordinance. If the proposed location of an addition, alteration or activity exists shall constitute <br /> accessory farm building does not meet the a separate violation. A non-permitted structure, <br /> locational requirements, a variance and a permit building, addition, alteration or activity is one <br /> must be requested from the board of adjustment. which requires the issuance of a permit under this <br /> (c) The zoning administrator may require the ordinance but which permit has not been issued by <br /> filing of a scale drawing of the premises, showing the zoning administrator. <br /> the dimensions of the lot or parcel, the (h) Any permit obtained through material <br /> dimensions of the proposed buildings,, the misrepresentation shall be null and void. <br /> distance in feet from the abutting street or (i) A permit issued pursuant to the provisions of <br /> highway and from the side and rear lot lines, the this section shall expire one year from the date of <br /> size and location of any existing buildings and issuance if construction is not started within that <br /> such other information as he deems necessary. time and will expire if construction once started <br /> He may also require evidence of compliance does not diligently proceed to completion within <br /> with the Dane County Sanitary Code, the Dane two years starting time. <br /> County Land Division and Subdivision (3) Inspections of buildings to be made by the <br /> Ordinance, Dane County Trunk Highway Access zoning administrator. (a) The owner or his or her <br /> Control Regulations or any other state or agent shall request that the zoning administrator <br /> township access or culvert permit requirements make the following inspections: <br /> as a condition precedent to the issuance of a 1. The first inspection shall be requested when <br /> zoning permit. The zoning administrator shall the foundations or basement walls are completed. <br /> not be responsible for determining the location 2. The second or final inspection shall be made <br /> of lot lines. before a certificate of compliance can be issued <br /> (d) Application for a permit must contain the under section 10.25(4) of this ordinance. <br /> following: name and address of the owner of the (b) The owner or his or her agent shall have all <br /> property, legal description, size and location of lot corners visibly staked prior to requesting an <br /> the building to be erected or moved on or onto inspection. If the zoning administrator is unable to <br /> the property, proposed use of the building or accurately verify the location of a building on its <br /> rev. 043094 <br />