Laserfiche WebLink
! - <br /> 1 <br /> 1 14-7 <br /> Section 14.51 DEFINITIONS. As an area in excess of 20,000 <br /> r- used in sections 14. 52 through square feet that is disturbed by <br /> 1 14.57, inclusive, the following landscaping or construction of <br /> words have the definitions buildings, parking lots, drives <br /> r_ indicated: or sidewalks are subject to <br /> ! Sections 14 . 51 through 14 .99 of <br /> i (1) LCC means the Dane County this Ordinance. <br /> Land Conservation Committe <br /> created under sec. 92.06 of the [ History: SubSection 14. 53 <br /> Wisconsin Statutes. repealed, 14 .53(1) recreated, by <br /> O.A. 45, 1987-88, published 5-5-: <br /> (2) LCC staff refers to staff 88. ] <br /> r� of the Land Conservation <br /> 1 Committee as authorized under s. <br /> 92.09 of the Wisconsin Statutes. . <br /> ( 3) Plan means the erosion Section 14.54 REQUIREMENTS OF <br /> ' control plan required by sec. EROSION CONTROL PLANS. An <br /> 14.53.. erosion control plan required <br /> under this section 14.53 shall <br /> ( consist of the following: <br /> ' ' Section 14.52 LEGISLATIVE <br /> FINDING. The county board of (1) cross section of road <br /> t supervisors of Dane County finds ditches; <br /> that soil erosion from construc (2) profile within road <br /> tion activities may be 10 to 100 ditches; <br /> times greater than erosion from <br /> agricultural activities on lands (3) culvert sizes; <br /> of equal size, slope and soil (4) direction of flow of <br /> ,— type. Construction activities runoff; <br /> and subsequent development can (5) watershed size for each <br /> disturb natural cover and land drainage area; <br /> surfaces resulting in a change in <br /> runoff patterns that may have a (6) design discharge for <br /> detrimental effect on water qual- ditches and structural measures; <br /> ity and downstream uses. Fur- (7) runoff velocities; <br /> ther, effective sediment and <br /> storm water management depends (8) fertilizer and seeding <br /> upon proper planning, design and rates and recommendations; <br /> timely installation of conserva- (9) time schedule for seeding; <br /> j tion practices as well as contin- design and location of erosion <br /> uing maintenance practices. control measures; <br /> r-` (10) method by which the lot(s) <br /> Section 14.53 APPLICABILITY OF are to be developed; <br /> REQUIREMENT FOR EROSION CONTROL <br /> ^ ( 1) Projects located in <br /> PLANS. ( 11) plans for disturbing the <br /> ! PS' area and for re-vegetation; and <br /> the R-4, A-B, B-1, C-1, C-2, LC- <br /> 1, & M-1 Districts and which have (12) a statement as to how any <br /> runoff resulting from <br /> construction will effect areas <br /> outside of the plat. <br /> . <br /> � <br /> � First Quarter, Supp. #9, 7/88 <br /> • <br />