|
Help
|
About
|
Sign Out
Home
Browse
Search
July Zoning Ordinance
DaneCounty-Planning
>
Zoning
>
Dane County Code of Ordinances
>
1980's
>
1981
>
July Zoning Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 11:38:22 AM
Creation date
11/21/2022 11:38:16 AM
Metadata
Fields
Template:
Planning Records
Document_Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> 2a-25 Zoning 10.126 • <br /> by a person resident on the premises. • adequate description of the operation; a <br /> plan of the site showing the proposed and . . <br /> 2. The land shall not be located within a existing roads and drives, the sources, • <br /> recorded subdivision. quantity and disposition of water to be used, <br /> if any; estimated dates for completion of the <br /> 3. The vehicle shall not be parked or extraction and commencement and <br /> stored within the required highway or road completion dates for the reclamation; a <br /> setback area. • reclamation plan and such other <br /> information as may be necessary to <br /> 4. The vehicle shall not be parked closer determine the nature of the operation and <br /> than 300 feet to another residence.. the effect on the surrounding area. <br /> 5. No new buildings shall be constructed 3. The reclamation plan shall contain <br /> for the housing of any aforedescribed • adequate provision that all final slopes <br /> vehicle. around the area be flatter than a three(3)to <br /> • one (1) horizontal slope in a sand, gravel or <br /> 6. Before any truck or semi-tractor or its borrow pit operation, or in a safe angle or <br /> trailer can be parked or stored subject to the repose in a quarrying operation; <br /> foregoing conditions, a certificate of excavations below the grade of the nearest <br /> compliance shall be issued by the zoning abutting public street or highway shall be <br /> administrator. setback from the street or highway a <br /> distance not less than that required for <br /> (m) Boarding buildings and structures under this <br /> ordinance; excavations made to a water <br /> (n) Horse show facilities but not includ- producing depth shall be not less than three <br /> ing commercial shows and rodeos where O.feet measured from the low water mark, <br /> admission is charged. Shall be subject to the all final slopes shall be covered with topsoil <br /> following conditions: from the original site and seeded to prevent <br /> erosion; the plan shall require that after <br /> 1. Adequate off-street parking shall be • completion of the anticipated operation that <br /> provided for both participants and audience the area shall be cleared of all debris and be <br /> vehicles. left in a workmanlike condition, subject to <br /> the approval of the Dane County Zoning <br /> 2. Food services, drinking water supplies Committee or its agent. <br /> and toilet facilities shall be approved by the <br /> Dane County Health Department. 4. Application for a conditional use <br /> permit for a mineral extraction operation <br /> (2) Conditional uses permitted in the A-2 proposed to be located within 600 feet of a <br /> Agriculture District. residence district zone,a residential subdivi <br /> sion, or a city or village limits line,or within <br /> (a) Mineral extraction. 300 300 feet of any building occupied for• <br /> • residential purposes; or for a hot blacktop <br /> 1. Mineral extraction operations mix or ready-mixed concrete plant, shall be <br /> including washing, crushing, quarrying . submitted to the Dane County Zoning <br /> borrow pits, or other processing or removal Committee for public hearing and approval. <br /> of mineral resources, the erection of The conditional use permit shall be for a <br /> buildings and the installation of necessary period of time as stated in the application or <br /> machinery used in said extraction or as modified by the Dane County Zoning <br /> . . processing, and the preparation of hot Committee. Modification of the application <br /> . blacktop mix and ready-mixed concrete are or reclamation plan may be permitted or <br /> conditional uses and may be permitted in additional conditions may be required upon <br /> the A-2 Agriculture District provided that: application. The Dane County Zoning <br /> Committee shall consider the effect of the <br /> 2. An appl ication for a permit shall be proposed operation and the proposed <br /> submitted by the owner and shall include an reclamation upon existing and future <br /> Sum,. No. I. 12 • <br />
The URL can be used to link to this page
Your browser does not support the video tag.