Laserfiche WebLink
10.126 <br /> 1.. Mineral extraction operations including washing, crushing, quarrying borrow pits, <br /> or other processing or removal of mineral resources, the erection of buildings <br /> and the installation of necessary machinery used in said extraction or processing, <br /> and the preparation of hot blacktop mix and ready-mixed concrete are conditional <br /> uses and may be permitted in the A-2 Agriculture District provided that: <br /> 2. An application for a permit shall be submitted by the owner and shall include an <br /> adequate description of the operation; a plan of the site showing the proposed and <br /> existing roads and drives, the sources, quantity and disposition of water to be <br /> used, if any; estimated dates for completion of the extraction and commencement and <br /> completion dates for the reclamation; a reclamation plan and such other information <br /> as may be necessary to determine the nature of the operation and the effect on the <br /> surrounding area. <br /> 3. The reclamation plan shall contain adequate provision that all final slopes around <br /> the area be flatter than a three (3) to one (1) horizontal slope in a sand, gravel <br /> or borrow pit operation, or in a safe angle of repose in a quarrying operation; ex- <br /> cavations below the grade of the nearest abutting public street or highway shall be <br /> setback from the street or highway a distance not less than that required for build- <br /> ings and structures under this ordinance; excavations made to a water producing <br /> depth shall be not less than three (3) feet measured from the low water mark, all <br /> final slopes shall be covered with topsoil from the original site and seeded to pre- <br /> vent erosion; the plan shall require that after completion of the anticipated opera- <br /> tion that the area shall be cleared of all debris and be left in a workmanlike condi- <br /> tion, subject to the approval of the Dane County Zoning Committee or its agent. <br /> 4. Application for a conditional use permit for a mineral extraction operation or for a <br /> hot mix blacktop mix plant or ready mixed concrete plant, shall be submitted to the <br /> Committee for a public hearing and approval. The conditional use permit shall be for <br /> a period of time stated in the application or as modified by the Committee. Modifica- <br /> tion of the application or reclamation plan may be permitted or additional conditions <br /> may be required upon application. The Committee shall consider the effect of the pro- <br /> posed operation and the proposed reclamation upon existing and future conditions, in- <br /> cluding streets, neighboring land development, land use drainage, water supply, water <br /> pollution, air pollution, soil erosion, natural beauty and land value of the local- <br /> ity. The Committee may approve, approve conditionally or reject the application and <br /> reclamation plan. <br /> 5. All existing mineral extraction operations shall be considered non-conforming uses <br /> and may be continued providing that they have been worked prior to the date of adop- <br /> tion of this ordinance and that they have been registered with the Dane County Zon- <br /> ing Administrator within one year of the date of the adoption of this Ordinance. <br /> 6. Conditional use permits are not required for land leveling activities or conserva- <br /> tion practices on agricultural land and where fill material or aggregate is re- <br /> moved from the property as an incidental activity. <br /> • <br /> 7. Portable cement batch or mixing plants or portable hot mix blacktop plants used in <br /> connection with a highway improvement or construction project do not require a con- <br /> ditional use permit. Material produced by such a plant shall be used only for the <br /> project and sale or use of material at any other location will require a conditional <br /> use permit. <br /> 8. Upon the expiration of any permit issued by the Zoning Administrator, the owner of a <br /> mineral extraction operation or his agent shall apply for a conditional use permit <br /> under ss 4. above. <br /> (b) Radio, television transmitting towers, microwave towers, community television antenna <br /> including the building or structures necessary for their operation but not including <br /> buildings for offices, studios or the like. The parcel of land shall be of a size <br /> large enough to insure that if a tower shall fall it will not fall on adjacent property <br /> or on the right-of-way of a public road. <br /> 26 <br />