|
Help
|
About
|
Sign Out
Home
Browse
Search
January Zoning Ordinance
DaneCounty-Planning
>
Zoning
>
Dane County Code of Ordinances
>
1980's
>
1984
>
January Zoning Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 11:57:05 AM
Creation date
11/21/2022 11:56:57 AM
Metadata
Fields
Template:
Planning Records
Document_Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.1grLe 1411112'34. <br /> • <br /> • <br /> • <br /> • <br /> Sub. no. 2 . <br /> to <br /> ORDINANCE AMENDMENT 8, 1986-87 <br /> AMENDING CHAPTERS 12 AND 75 OF THE DANE COUNTY CODE OF ORDINANCES, <br /> ADJUSTING FEES FOR CERTAIN SERVICES FROM <br /> THE LAND REGULATION DEPARTMENT <br /> The County Board of Supervisors of the County of Dane does ordain as follows: <br /> Unless otherwise expressly stated, all references herein to section, subsection <br /> and chapter numbers are to those of the Dane County Code of Ordinances. <br /> r � <br /> II. Section 12.03 is amended to read as follows: <br /> Section 12.03 SINGLE FAMILY AND DUPLEX RESIDENCES. For construction <br /> of new single family and duplex residences the fee shall be 0709 $10.00 plus <br /> $0.025 for each square foot of floor area including basements and attached <br /> garages. Measurements to be made using outside dimensions. When computed <br /> - — the amount shall be rounded to the nearest dollar. <br /> III. Section 12.04 is amended to read as follows: <br /> Section 12.04 • ALL OTHER BUILDINGS. (1) The fellevi4ng-fee seheE e <br /> e- ablished for all new construction, alterations and additions to existing <br /> • buildings and buildings used for agricultural purposes ha: where a permit is <br /> required because of locational requirements a of Board of Adjustment peatf `rs <br /> Pee, ed, except as provided in Section 12.03-:- .2-5-.-3G , shall be $30.00 plus $1.00 <br /> for each $1,000 or fraction thereof of construction costs. • <br /> (2) Cost of construction shall include the cost of mechanical equipment, but not <br /> including the cost of manufacturing or processing equipment or machinery, site <br /> preparation, sewage disposal systems, utility lines and landscaping. <br /> • <br /> IV. Section 12.05 is amended to read as follows: <br /> • <br /> Section 12.05 PERMIT FEES. Via} M (1) The fee for a mineral extraction <br /> • ._ permits shall be $59-9 $75.00. • <br /> {�} P (2) The fee for a zoning permits to place fill, grade or excavate in a flood <br /> plain area shall be $40.00. <br /> • <br /> {e). P (3) The fee for a petitions to amend the zoning ordinance shall be $75.00. <br /> VE . SEC. (37i /ig6 • <br /> MR- <br /> .'r <br />
The URL can be used to link to this page
Your browser does not support the video tag.