|
Help
|
About
|
Sign Out
Home
Browse
Search
2/1976-12/1976 Zoning Ordinance
DaneCounty-Planning
>
Zoning
>
Dane County Code of Ordinances
>
1970's
>
1976
>
2/1976-12/1976 Zoning Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 1:56:49 PM
Creation date
11/21/2022 1:56:45 PM
Metadata
Fields
Template:
Planning Records
Document_Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
inventory or machinery or equipment used off of the premises for other than agri- <br /> cultural purposes. An accessory building can be built on parcels of land in the <br /> A-1 Agriculture District without the necessity of there being a residence on the <br /> property. <br /> (k) The seasonal storage of recreational equipment and motor vehicles owned by pri- <br /> vate individuals other than those resident on the premises, such storage to be in <br /> existing accessory farm buildings. The storage of a dealer's inventory or the con- <br /> struction of any new buildings for storage shall be considered a commercial use and . _ <br /> subject to the provisions of this ordinance. <br /> (2) CONDITIONAL USES PERMITTED IN THE A-1 AGRICULTURE DISTRICT <br /> (a) Mineral extraction. <br /> 1. Mineral extraction operations including washing, crushing, quarrying borrow <br /> pits, or other processing or removal of mineral resources, the erection of <br /> buildings and the installation of necessary machinery used in said extraction <br /> or processing, and the preparation of hot blacktop mix and ready-mixed con- <br /> crete are conditional uses and may be permitted in the A-1 Agricultural Dis- <br /> trict provided that: <br /> 2. An application for a permit shall be submitted by the owner and shall include <br /> an adequate description of the operation; a plan of the site showing the pro- <br /> posed and existing roads and drives, the sources, quantity and disposition of <br /> water to be used, if any; estimated dates for completion of the extraction and <br /> commencement and completion dates for the reclamation; a reclamation plan and <br /> such other information as may be necessary to determine the nature of the <br /> operation and the effect on the surrounding area. <br /> 3. The reclamation plan shall contain adequate provision that all final slopes <br /> around the area be flatter than a 3 to 1 horizontal slope in a sand and gravel <br /> or borrow pit operation, or in a safe angle or repose in a quarrying operation; <br /> excavations below the grade of the nearest abutting public street or highway shall <br /> be setback from said street or highway a distance not less than that required <br /> for buildings and structures under this ordinance; excavations made to a water <br /> producing depth shall be not less than 3 feet measured from the low water mark, <br /> all final slopes shall be covered with topsoil from the original site and seeded <br /> to prevent future erosion; the plan shall require that after completion of the <br /> anticipated operation that the area shall be cleared of all debris and be left <br /> in a workmanlike condition, subject to the approval of the Dane County Zoning 1_. <br /> Committee or its agent. <br /> 4. Application for a conditional use permit for a mineral extraction operation pro- <br /> posed to be located within 600 feet of a residence district zone, a residential <br /> subdivision, or a city of village limits line, or within 300 feet of any <br /> building occupied for residential purposes or for a hot blacktop mix or ready <br /> mixed concrete plant, shall he submitted to the County Zoning Committee for <br /> public hearing and approval. The Conditional Use Permit shall be for a period <br /> of time as stated in the application or as modified by the County Zoning Committee <br /> Modification of the application or reclamation plan may be permitted or addi- <br /> tional conditions may be required upon application. The County Zoning Committee <br /> shall consider the effect of the proposed operation and the proposed reclamation <br /> upon existing and future conditions, including streets, neighboring land develop- <br /> ment, land use drainage, water supply, water pollution, air pollution, soil <br /> erosion, natural beauty and land value of the locality. The County Zoning <br /> Committee may approve, approve conditionally or reject the application and re- <br /> clamation plan. <br /> 5. All other applications for conditional use permits for mineral extraction shall <br /> include a letter of approval of the site by the town board of the town affected <br /> and shall be submitted to the County Zoning Administrator who shall issue the <br /> permit for a period of time as stated in the application but not to exceed four <br /> years providing that the application and reclamation plan meets the terms of <br /> this ordinance. The owner may apply for renewal of the permit or modification <br /> of the permit. All existing mineral extraction operations shall be considered <br /> nonconforming uses and may be continued providing that they have been worked <br /> prior to the date of adoption of this ordinance and that they have been re- <br /> gistered with the Dane County Zoning Administrator within one year of the date <br /> of the adoption of this ordinance. <br /> - 20 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.