Laserfiche WebLink
SECTIONS 10.31; 10.32 <br />an average frequency in the order of the one hundred (100) year recurrence <br />interval flood determined from an analysis of floods on a particular stream <br />and other streams in the same general region. <br />(14) Standard Project Flood: A hypothetical flood, estimated by the Corps of En- <br />gineers, representing the critical flood runoff volume and peak discharge that <br />may be expected from the most severe combination of meterological and hydro- <br />logic conditions that are considered reasonably characteristic of the geogra- <br />phical region involved, excluding extremely rare combinations. <br />(15) Storage Capacity of a Flood Plain: The volume of space above an area of .flood <br />plain land that can be occupied by flood water of a given stage at a given time, <br />regardless of whether the water is moving. <br />(16) Structure: Anything constructed or erected, the use of which requires a more <br />or less permanent location on or in the ground. Includes but is not limited to <br />objects such as buildings, factories, sheds, and cabins. <br />a. Permanent Structure: A structure which is built of such materials and in <br />such a way that it would commonly be expected to last and remain useful for <br />a substantial period of time. <br />b. Temporary _Structure: A structure which is built of such materials and in <br />such a way-that it would commonly be expected to have a relatively short <br />useful life, or is built for a purpose that would commonly be expected to be <br />relatively short -term. <br />10.32 GENERAL PROVISIONS <br />(a) Jurisdiction: The jurisdiction of this Section includes all lands, adjacent to each <br />navigable reach of river or stream within the boundaries of Dane County, Wisconsin, <br />that would be inundated by the regional flood. <br />(b) District Boundaries: The boundaries of the general flood plain district shall be as <br />they appear on the Zoning District Maps on file in the office of the Dane County <br />Zoning Supervisor. <br />(1) The Flood plain District boundary shall be subject to the provisions of 10.03 of <br />the Zoning Ordinance. <br />p.L / (2) Compliance with the provisions of this Section shall not be grounds for the <br />removal of lands from the flood plain district unless such lands are filled to <br />a height of at least two feet above the elevation of the standard project flood <br />for the particular area and are contiguous to other lands lying outside the <br />flood plain district. <br />(c) Effect of Flood Plain District Regulations: The regulations set forth in this Section <br />for the flood plain district shall apply only to the flood plains mapped on the of- <br />ficial zoning map and shall be void and of no effect in areas not mapped as being <br />included in the flood plain districts. The regulations of this Section shall be <br />construed as being supplementary to the regulations imposed on the same lands by an <br />underlying zoning ordinance. When flood plain and underlying zoning ordinance <br />regulations conflict with one another, the most restrictive combination of such <br />regulations shall govern. <br />46 - <br />