Laserfiche WebLink
SECTION 10.33 <br />lines, pipelines, and water monitoring devices; subject to regulations <br />pursuant to Chapter 30, Wisconsin Statutes. <br />(5) Navigational and Drainage Aids such as channels, channel markers, buoys, <br />and other such devices. <br />(6) Other water related uses such as docks, piers, wharves, bridges, culverts, <br />and river crossings of transmission lines subject to any pier or dockline <br />regulations pursuant to Chapter 30, Wisconsin Statutes. <br />(c) Special Exceptions: Any of the following uses enumerated in this section may be <br />permitted upon application to the Zoning Supervisor and the issuance of a special <br />exception permit by the Board of Adjustment as provided in Section 10.35 (c) Special <br />Exception Permits of this Section. <br />(1) Structures Accessory to open -space uses permitted in 10.33 (b) whether temporary <br />or permanent may be permitted' upon a determination by the Board of Adjustment <br />pursuant to a finding under the procedure required by Section 10.35 (c) Speciai <br />Exception Permits of the Section that <br />(a) Structures will.not be designed for human habitation. <br />(b) Structures will have a low flood damage potential. <br />(c) The structure or structures, if permitted will be constructed and placed on <br />the building site so as to ot't'er the minimum obstruction to the flow of <br />flood waters. <br />1. To the extent practicable, structures will be constructed with the . <br />longitudinal axis parallel to the direction of flow of flood waters. <br />2. So far as practicable, structures will be placed so their longitudinal <br />axis are approximately on the same line as those -of adjoining structures. <br />(d) Structures will be firmly anchored to prevent the structure or building <br />from floating away and thus threatening to further restrict bridge openings <br />and other restricted sections of the stream or river; and <br />(e) Service facilities such as electrical and heating equipment will be at or <br />above the flood protection elevation for the particular area. <br />(2) Other structures may be permitted only upon a finding by the Board of Adjustment <br />that; <br />(a) Such structures shall comply with Section 10.3-1 (c) (1) c.d.e. of this <br />Section. <br />(b) The first floor, including any basement floor designed for human habi- <br />tation, of any structure to be erected, constructed, reconstructed, or <br />moved on the flood plain shall be constructed on fill at or above the <br />flood protection elevation for the particular area. The fill shall be <br />not less than one foot below the flood protection elevation for the <br />particular area and the fill shall extend at such elevation at least 15 <br />feet beyond the limits of any structure or building erected thereon. <br />(3) Fills or Deposition of Materials may be permitted only upon a finding by the <br />Board of Adjustment that: <br />- 48 - <br />