|
Help
|
About
|
Sign Out
Home
Browse
Search
PO Planning 2009-2017
DaneCounty-Planning
>
Clerical
>
Archives
>
PO Planning 2009-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2022 9:56:08 AM
Creation date
12/5/2022 3:48:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
any unearned payment otherwise due to SUBRECIPIENT if COUNTY reasonably <br />suspects any of the following: <br />1. SUBRECIPIENT has mismanaged any funds provided by COUNTY. <br />2. Funds in SUBRECIPIENT's possession are at risk of being seized by <br />SUBRECIPIENT's creditors or other adverse interest. <br />3. SUBRECIPIENT appears incapable of maintaining itself as a going concern. <br />C. Total Payment. <br />The total amount to be paid to SUBRECIPIENT under this Agreement shall not exceed <br />the Maximum Cost shown on page one. Drawdowns for the payment of eligible <br />expenses shall be made against the line item budgets specified in Schedule B herein and <br />in accordance with performance. <br />XLIII. PROCUREMENT STANDARDS <br />A. SUBRECIPIENT will comply with the procurement standards under 24 CFR 85.36 for <br />governmental subrecipients and 24 CFR 84.40-48 for subrecipients that are non- <br />profit organizations including the requirements for bonding in procurement. <br />B. SUBRECIPIENT is the responsible authority, without recourse to HUD or the <br />COUNTY regarding the settlement of all contractual and administrative issues arising <br />out of the procurement entered in support of the award or other agreement. <br />C. SUBRECIPIENT shall conduct all procurement in a manner to provide to the <br />maximum extent practical, open and free competition. Contractors that develop or <br />draft specifications, requirements, statements of work, invitations for bids or requests <br />for proposals shall be excluded from competing for a project, <br />D. General requirements for procurement include, but are not limited to <br />i. SUBRECIPIENT must maintain records to detail the significant history of a <br />procurement. These records include, but are not limited to: files on the <br />rationale for selecting the method of procurement used, selection of the <br />contract type, the contractor selection/rejection process, and the basis for the <br />cost or price of a contract. <br />ii. Pre -qualified lists of vendors/contractors, if used, must be current, developed <br />through open solicitation, include adequate numbers of qualified sources, <br />and must allow entry of other firms to qualify at any time. <br />iii. SUBRECIPIENTS must ensure that awards are not made to any party which <br />is debarred or suspended or is otherwise excluded from or ineligible for <br />participation in Federal assistance programs under Executive Order 12549. <br />iv. There must be written selection procedures for procurement transactions. <br />v. SUBRECIPIENTS must not use "cost plus a percentage of cost" pricing for <br />contracts. In addition, SUBRECIPIENTS should use "time and material" type <br />contracts only after a determination is made that no other contract type is <br />suitable and the contract includes a ceiling price that the contractor exceeds <br />at its own risk. <br />v:. SUBRECIPIENTS must have protest procedures in place to handle and <br />resolve disputes relating to their procurement and in all instances report such <br />disputes to the COUNTY. <br />vii. There must be a documented system of contract administration for <br />determining the consistency of contractor performance. <br />Page 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.