|
Help
|
About
|
Sign Out
Home
Browse
Search
REINEN, 36
DaneCounty-Planning
>
Land Division-Parcel Status Determination
>
Verona
>
REINEN, 36
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 9:12:27 AM
Creation date
5/6/2024 9:41:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
115 Enterprise Drive <br />Verona, Wisconsin 53593 <br />Steven E Reinen, D.C. <br />March 25, 2004 <br />Norb Schribner <br />Plot Review Officer <br />Dane County Planning and Development <br />210 Martin Luther King Jr. Blvd. <br />Madison, WI 53703 <br />Dear Mr. Schribner, <br />(608) 845-8860 <br />FAX (608) 845-7770 <br />I was recently talking with two members of the Verona Town Board <br />and the subject of the necessity of a variance being required <br />for a closed end town road exceeding 1,000 feet came up. It was <br />their opinion that such a variance is no longer required as long <br />as all other stipulations for town road construction are met and <br />the end of the road is either a loop or provides a cul-de-sac of <br />adequate size. Your expert opinion on this matter would be greatly <br />appreciated. <br />Please feel free to make your comments on the bottom of this letter <br />and return it in the enclosed envelope. Thank you for your time and <br />expertise. <br />Yours truly, <br />Steven P. Reinen, D.C. <br />SPR:jes <br />
The URL can be used to link to this page
Your browser does not support the video tag.