/ SALVAGED TOPSOIL EXCAVATION \/\ <br />— — — — — \— — — — — — TAPER CURB FROM <br />--_-- _— _-- ---- 6" TO 0" IN 10' <br />— — — — I <br />1 VAR WIDTH <br />EXCAVATION BELOW SUBGRADE — — _ _ _ C. 8 G. \L <br />LOCATION AND DEPTH AS DESIGNATED <br />BY THE ENGINEER BIT SHOULDER ) �— BIT SHOULDER <br />DETAIL FOR EXCAVATION BELOW SUBGRADE _ y <br />TAPER IN 10 <br />4 CONC. PAV'T j <br />\IlO DIRECTION <br />OF TRAFFIC <br />t , <br />DETAIL FOR CURB & GUTTER CUTOFFS <br />30 MAX l <br />EITN <br />SECTION TO BE CONC. DRIVEWAY "1 <br />TRUCTED BY PROPERTY OWNER, IN <br />OF MADISON. ALL OTHERS TO BE REPLACED <br />ND AS PART OF THIS PROJECT. —� <br />THIS SECTION TO BE--_ <br />PAID FOR AS C 8 G. <br />A— ,—__FLOW LINE CAN BE EXTENDED <br />TO IMPROVE APPROACH <br />_ COMMERCIAL DRIVEWAY <br />- <br />A <br />6REEf TOTAL <br />NUNlER 811EET>• <br />STANDARD <br />DETAIL DRAWINGS <br />RADE <br />BD PROFILE <br />2.4 LZ9 <br />STANDARD <br />2-I.I.II <br />CONCRETE PAVEMENT REINFORCEMENT' <br />- - VAR.' �;;UNDERCUT - <br />1— <br />2-3.1.3 <br />STRUCTURE APPROACH AND CONCRETE PAVEMENT APPROACH SLAB <br />DISTANCES AS DETERMINED <br />T. L, <br />TRANS'T LINE <br />/w THE ENGINEER <br />3-1.1.7 <br />, <br />CONCRETE CURB, GUTTER, COMBINATION CURB 8 GUTTER, SURFACE DRAIN <br />/VARIABLE VARIABLE_ <br />/ <br />4-4.4.7 <br />LONGITUDINAL JOINTS - CONCRETE PAVEMENT <br />A <br />tpP50\V <br />4-4.5.9 <br />TRANSVERSE JOINTS - CONCRETE PAVEMENT. <br />G p/ <br />Sp�NP --FINISHED SHOULDER LINE-----, <br />5-3.3.2 <br />CATCH BASINS <br />TO AN APPROXIMATE DEPTH OF 4' AT T IME OF PLAC LNG' ON <br />LINE <br />\� <br />5-3.4.7 <br />CATCH BASIN AND INLET COVERS <br />VAR <br />MENT, SHOULDERS, AND AREAS ALREADY COVERED <br />5-3.5.2 <br />INLETS - <br />WITHSUITABLE GRASSES, SHALL BE FERTILIZED AND <br />5-3.7.2 <br />MANHOLES <br />- <br />5-3.8.2 <br />MANHOLE COVERS. <br />SECTION A -A <br />CROSS SECTION SHOWING UNDERCUT <br />6-2.6 2 <br />APRON ENDWALLS FOR CULVERT PIPE AND PIPE ARCH <br />DETAI L FOR EXCAVATION <br />7- 1.3.4 <br />MARKER POST AND MARKER POSTS FOR RIGHT OF WAY <br />AT MOUTH OF CUTS <br />7-2.4.10 <br />STEEL PLATE BEAM GUARD 8 STEEL BEAM MEDIAN GUARD <br />BY THE TON- OR CUBIC YARD, THE DEPTH OR THICKNESS <br />7-4.1.4 <br />CONSTRUCTION BARRICADE <br />OF THE COURSE SHOWN ON THEPLANS IS APPROXIMATE <br />8-2. I.4 <br />SODDED BACKSLOPE FL'LYE 8 INTERCEPTING EMBANKMENT <br />AND THE ACTUAL THICKNESS WILL DEPEND ON THE <br />8- 3.3.6 <br />SLOPE PAVING <br />- <br />12- 1. 1, 2 <br />LANDMARK REFERENCE MONUMENTS <br />/ SALVAGED TOPSOIL EXCAVATION \/\ <br />— — — — — \— — — — — — TAPER CURB FROM <br />--_-- _— _-- ---- 6" TO 0" IN 10' <br />— — — — I <br />1 VAR WIDTH <br />EXCAVATION BELOW SUBGRADE — — _ _ _ C. 8 G. \L <br />LOCATION AND DEPTH AS DESIGNATED <br />BY THE ENGINEER BIT SHOULDER ) �— BIT SHOULDER <br />DETAIL FOR EXCAVATION BELOW SUBGRADE _ y <br />TAPER IN 10 <br />4 CONC. PAV'T j <br />\IlO DIRECTION <br />OF TRAFFIC <br />t , <br />DETAIL FOR CURB & GUTTER CUTOFFS <br />30 MAX l <br />EITN <br />SECTION TO BE CONC. DRIVEWAY "1 <br />TRUCTED BY PROPERTY OWNER, IN <br />OF MADISON. ALL OTHERS TO BE REPLACED <br />ND AS PART OF THIS PROJECT. —� <br />THIS SECTION TO BE--_ <br />PAID FOR AS C 8 G. <br />A— ,—__FLOW LINE CAN BE EXTENDED <br />TO IMPROVE APPROACH <br />_ COMMERCIAL DRIVEWAY <br />� Ito <br />a <br />I -I z <br />w ole <br />U U <br />Q IW <br />' a trti <br />� 5 MIN. Z <br />10, MIN. <br />B ~I --I <br />I THIS SECTION TO IBE PAID ! <br />IFOR AS 5" CONC iSIDEWALK 5" SIDEWALK <br />I <br />-.20 MAX 2' TO 4' _— <br />2. t <br />/ To BE REPLACED IN KIND <br />AS PART OF THIS PROJECT <br />THIS SECTION TO BE <br />PAID FOR AS C. B G <br />FLOW LINE CAN BE EXTENDED <br />TO IMPROVE APPROACH <br />RESIDENTIAL DRIVEWAY <br />N <br />_J1 5' <br />I1 <br />i <br />II� BV2'I <br />0 <br />I <br />SECT, B -B <br />1 <br />DETAILS <br />FOR <br />U.S. H. 151 - I.H. 90 ROAD <br />PROJECT F017-2(64) DANE CO. <br />NOT TO SCALE <br />I <br />- <br />CROJER <br />6REEf TOTAL <br />NUNlER 811EET>• <br />F017-2(64)1 <br />2.4 LZ9 <br />STANDARD <br />_ <br />ABBREVIATIONS <br />GENERAL NOTES <br />T. L, <br />TRANS'T LINE <br />NO TREES ARE TO BE REMOVED WITHOUT THE APPROVAL <br />E <br />REFERENCE LINE <br />OF THE ENGINEER, <br />SHRINKAGE VARIABLE, ESTIMATED AT 25%-35% <br />A. ItAUXILIARY <br />REFERENCE UNE <br />TOPSOIL OR SALVAGED TOPSOIL SHALL BE PLACED <br />E <br />CENTER <br />TO AN APPROXIMATE DEPTH OF 4' AT T IME OF PLAC LNG' ON <br />LINE <br />ALL CUT AND FILL SLOPES, - - ^ ' <br />E. B. <br />EAST BOUND <br />ALL THE RIGHT -OF -WAY, EXCLUSIVE OF THE PAVE- <br />MENT, SHOULDERS, AND AREAS ALREADY COVERED <br />W. B. <br />WEST BOUND <br />WITHSUITABLE GRASSES, SHALL BE FERTILIZED AND <br />SEEDED <br />P.L. <br />PROPERTY :INE <br />CURVE DATA BASED ON ARC DEFINITION. <br />I. P. <br />IRON PIN <br />WHEN THE QUANTITY OF THE ITEMS OF SUBBASE, <br />BASE OR SURFACE COURSE IS MEASURED FOR PAYMENT <br />R/W <br />RIGHT OF WAY <br />BY THE TON- OR CUBIC YARD, THE DEPTH OR THICKNESS <br />OF THE COURSE SHOWN ON THEPLANS IS APPROXIMATE <br />L.H.E. <br />LIMITED HIGHWAY EASEMENT <br />AND THE ACTUAL THICKNESS WILL DEPEND ON THE <br />DISTRIBUTION OF THE MATERIAL AS DIRECTED BY THE <br />F. L, <br />FLOW LINE <br />ENGINEER, <br />BEARINGS SHOWN ON THIS PLAN ARE THE TRUE <br />M. H. <br />MANHOLE <br />BEARINGS SHOWN TO THE NEAREST MINUTE. <br />C.B. <br />CATCH BASIN <br />EXCAVATION BELOW SUBGRADE IS SHOWN IN THE <br />BALANCE POINTSAND IS ADDED IN "UNCLASSIFIED", <br />INL. <br />INLET <br />BUT IS NOT SHOWN ON THE CROSS SECTIONS. <br />C.o. <br />..JLVE�" 'I'E <br />STR A`W MULCH SHALL BE PLACED ON TOPSOIL BACK - <br />SLOPES AND F'.LL SLOPES IN AREAS DESIGNATED ON <br />C.�M,-C-F. <br />CORPUG A -ED METAL CULVERT PIPE <br />THE MISCELLANEOUS OUANTITIES SHEET. <br />R -C. P, <br />REINFORCED CONCRETE PIPE <br />ALL CATCH BASIN SUMPS ARE TORE OMITTED. <br />S <br />SEWER <br />EXPANSION JOINTS TO BE CONSTRUCTED AT ALL <br />- <br />RADIUS PCINTS IN CURB 8 GUTTER. <br />L'..l'_. <br />l ­k cIEC <br />C Ch CRETE DRIVEWAY AND SLAB REMOVALS SHALL <br />F <br />BE MEASURED AND PAID FOR UNDER THE ITEM OF <br />REMOVING CONCRETE SIDEWALK. <br />WHERE PAVED PARKING LOTS ARE TO BE LEFT IN <br />UTILITIES <br />PLACE THE PAVENENT SHALL BE SAWED ALONG THE <br />PROPERTY LINE, AND THE PAVED AREA BETWEEN THE <br />MA DISCN <br />GAS 6 ELECTR,C CC <br />PROPERTY LINE AND CURB SHALL BE REPLACED WITH <br />TOPSOIL, AS DIRECTED BY THE ENGINEER. <br />WISCONSIN <br />TELEPHONE CO. <br />CONTRACTION JOINTS IN PAVEMENT ADJACENT TO <br />CURB AND GUTTER SHALL HAVE A MAXIMUM SPACING <br />OF 50' 2 (4C' MIN.), EXCEPT IF OTHERWISE SHOWN ON <br />THE PLAN. CONTRACTION JOINTS IN RURAL TYPE <br />PAVEMENT SHALL HAVE A MAXIMUM SPACING OF 80' <br />([2') AS NOTED ON STANDARD DETAIL DRAWING <br />4-4.5,9, <br />LOCATION OF COMMERCIAL DRIVEWAYS IN THE CITY OF <br />MADISON ARE SHOWN ON THE PLAN. PERMITS FOR THESE DRIVE- <br />WAYS HAVE BEEN ISSUED BY THE CITY OF MADISON AND <br />ANY CHANGE IN THEIR LOCATION WILL REQUIRE A NEW <br />PERMIT FROM THE CITY. EXACT NUMBER AND LOCATION ^ <br />. <br />OF ALL OTHER PRIVATE ENTRANCES TO BE DETERMINED <br />BY THE ENGINEER IN THE FIELD. <br />� Ito <br />a <br />I -I z <br />w ole <br />U U <br />Q IW <br />' a trti <br />� 5 MIN. Z <br />10, MIN. <br />B ~I --I <br />I THIS SECTION TO IBE PAID ! <br />IFOR AS 5" CONC iSIDEWALK 5" SIDEWALK <br />I <br />-.20 MAX 2' TO 4' _— <br />2. t <br />/ To BE REPLACED IN KIND <br />AS PART OF THIS PROJECT <br />THIS SECTION TO BE <br />PAID FOR AS C. B G <br />FLOW LINE CAN BE EXTENDED <br />TO IMPROVE APPROACH <br />RESIDENTIAL DRIVEWAY <br />N <br />_J1 5' <br />I1 <br />i <br />II� BV2'I <br />0 <br />I <br />SECT, B -B <br />1 <br />DETAILS <br />FOR <br />U.S. H. 151 - I.H. 90 ROAD <br />PROJECT F017-2(64) DANE CO. <br />NOT TO SCALE <br />I <br />