|
Help
|
About
|
Sign Out
Home
Browse
Search
USH151-VERONA-AVENUE_T017-2(44)
DaneCounty-Planning
>
Clerical
>
Sam
>
Fricky
>
CDs Other
>
HWY Plans 10 Drawers
>
Hwy Plans 151-188
>
USH151-VERONA-AVENUE_T017-2(44)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2025 11:07:47 AM
Creation date
3/7/2025 11:05:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTE: 4/00", <br />Fw Station Location Fiber CUdaa for <br />ofTrotficLight Traffic Signal <br />Cable Conduit and t Detector <br />_ Conduit for Signal r I <br />Detector see- <br />. i General Plans <br />/ /TratticLights / <br />N ///, fetal Cudull ' c <br />1` m <br />Fiber Conduit for �[ DETAIL OF <br />Traffic Signat PAVEMEN r <br />Detector INTERSECTION <br />/i22' <br />PLAN VIEW <br />SHOWING RELATIVE POSITION OF <br />TRAFFIC LIGHT CONDUITS AND <br />TRAFFIC SIGNAL: DETECTOR CONDUITS <br />AT. UNDIVIDED HIGHWAY INTERSECTIONS <br />NOTE <br />For Station Location <br />Fiber Conduit for of Traffic Light Cable <br />Traffic Signal Median Conduit and Conduit <br />Detector Strip far signal Detectors <br />see General Plons. <br />o <br />N <br />,raffi,, it Lights• i l <br />Metol Conduit - T• <br />DETAIL OF MeFiber Conduit for ' <br />PAVEMENT ion Traffic Signal <br />INTERSECTION Strip Detector <br />PLAN VIEW <br />SHOWING RELATIVE POSITION OF <br />TRAFFIC LIGHT CONDORS AND <br />TRAFFIC SIGNAL DETECTOR CONDUITS <br />AT DIVIDED HIGHWAY INTERSECTIONS <br />'Arrow Marker in - <br />Normal scribed inpavement <br />Pavement Thickness surface over CE of . <br />Fiber Conduit. <br />'.Cap ` 5 FiberCenduitforTraffis CONCRETE. Edge of <br />ISOpe <br />Signal Detector u r PAVEMENT ° Pwerrnent�: Plug this end to " <br />... '. w Curb .. prevent injury to aoneluir. <br />a /Ft for drainage � <br />/ \ \� ••� ���\� �� Following the removal of pavement <br />forms, plug shall be fully exposed <br />by removal of any concrete deposited <br />over plug. The plug shall then be <br />removed,anduit and plug cleaned and <br />TRAFFIC SIGNAL'.DETECTOR FOR' plug replaced prior to backfilling. <br />UNDIVIDED HIGHWAYS <br />Arrow Marker <br />CONCRETE - 3 Fiber Carduafor 7raffic PAVEMENT <br />Signal detector v <br />S� <br />4t F'' II 2"X4"wood <br />Send , -III Support Blocks <br />Z"Ox2'-6"Slee) Anchors IZ' <br />spored at 3'-5' C:C. If two <br />sections of conduit are req d, <br />place Anchor at coupling. - - <br />SIDE a END ELEVATIONS <br />SHOWING I PLACEMENT DETAILS <br />FOR TRAFFIC SIGNAL DETECTOR CONDUIT <br />E <br />Arrrnv Marker inscribed in pact , <br />2" surface over (L Fiber Conduits Normal Pavement Thickness <br />12 <br />° CONCRETE 9 - c-., <br />c PAVEMENT-- <br />/F1! .far aroma <br />a <br />3'_5�Dding_uppon combinations of <br />Fiber Con it lergTmis` --" -- I 3° Fiber Conduit <br />Traffic Signal Detector <br />TRAFFIC SIGNAL DETECTOR FOR <br />DIVIDED HIGHWAYS <br />Arrow Marker inscribed in Arrow Marker inscribed in <br />pavement surpavement <br />t face over Pavement// surface aver <br />pavement/Pipe Conduit, z0f, Pipe Conduit. <br />t � U <br />v <br />o CONCRETE v "p',` a : :PAVEMENT <br />Base I ,Course <br />{ <br />Slope either way I/B' Per Ft for drafno e � — <br />i <br />CLEVATION ON CENTERLINE <br />SHOWING PLACEMENT DETAILS <br />CONDUIT <br />Arrow Marker to be inscribed in fresh concrete and/or bitum- <br />inous surfacing Ia to �/e deep at each location where pipe <br />conduit or fiber cord. are placed under rigid surfacing. <br />PLAN VIEW -ARROW MARKER <br />GENERAL NOTES <br />Details of Construction not shown on this drawing shall conform to the pertinent <br />requirements of the Standard Specifications, and the applicable <br />Special Provisions. <br />MATERIALS <br />Metol Conduit sholl be furnished and placed as shown hereon and <br />in accord with the Stondord Speeificuliori% <br />Fiber Conduit shall be furnished and placed as shown hereon and <br />in accord with the Standard Specifications. W <br />MEASUREMENT a PAYMENT <br />The item of Fiber Conduit Shall be measured and paid for by the linear foot <br />complete in place and in accord with Standard Specifications <br />CONDUIT SIZE - <br />-Udess shown or required otherwise on the plans, Metal Conduit shot be 2" 1. D. <br />I <br />P"..'.. <br />r <br />- <br />Arrow Marker to be inscribed in fresh concrete and/or bitum- <br />inous surfacing Ia to �/e deep at each location where pipe <br />conduit or fiber cord. are placed under rigid surfacing. <br />PLAN VIEW -ARROW MARKER <br />GENERAL NOTES <br />Details of Construction not shown on this drawing shall conform to the pertinent <br />requirements of the Standard Specifications, and the applicable <br />Special Provisions. <br />MATERIALS <br />Metol Conduit sholl be furnished and placed as shown hereon and <br />in accord with the Stondord Speeificuliori% <br />Fiber Conduit shall be furnished and placed as shown hereon and <br />in accord with the Standard Specifications. W <br />MEASUREMENT a PAYMENT <br />The item of Fiber Conduit Shall be measured and paid for by the linear foot <br />complete in place and in accord with Standard Specifications <br />CONDUIT SIZE - <br />-Udess shown or required otherwise on the plans, Metal Conduit shot be 2" 1. D. <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.