|
Help
|
About
|
Sign Out
Home
Browse
Search
CTHM-USH12-WESTPORTRD--MIDDLETON-WAUNAKEERD_S0642(2)--S0455(1)_1
DaneCounty-Planning
>
Clerical
>
Sam
>
Fricky
>
CDs Other
>
HWY Plans 10 Drawers
>
Hwy Plans I-M
>
CTHM-USH12-WESTPORTRD--MIDDLETON-WAUNAKEERD_S0642(2)--S0455(1)_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2025 12:32:15 PM
Creation date
3/7/2025 12:32:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J <br />a <br />CONVENTIONAL SIGNS <br />STATE Of WISCONSIN <br />STATE HIGHWAY COMMISSION OF <br />BEGINNING OF PROJECT S 0642(2) SEC. I <br />STATION 0+00 <br />EXCEPTION TO NET CENTERLINE LENGTH <br />STATION 51+96.8 TO STATION 52+32.8 <br />END OF PROJ. S 0642 (2) SEC. I STA. 69 + 666,-8 <br />BEGINNING OF PROJECT S 0455(1) _ <br />STATION 54+04.4 PROJECT - 0455(2) <br />END OF PROJECT S 0455 (I ) <br />BEGINNING OF PROJECT S 0642(2) SEC.2 <br />STATION 118 + 23.2 <br />END OF PROJECT S 0642(2) <br />STATION 131+27 <br />STATE LINE___ -_ - - =m � <br />INDEX <br />OF SHEETS <br />SHEET <br />NO. I <br />TITLE <br />SHEET <br />NO. 2 <br />TYPICAL CROSS SECTIONS <br />SHEET <br />NO. 3 <br />ESTIMATE OF QUANTITIES <br />SHEET <br />NO, 3A <br />MISCELLANEOUS QUANTITIES <br />SHEET <br />N0.4 -4.2 <br />RIGHT OF WAY PLAT <br />SHEET <br />NO. 5- 9 <br />PLAN AND PROFILE STA. 0 X00 TO STA. 131+ 27 <br />SHEET <br />NO. <br />STANDARD DETAILS <br />SHEET <br />NO. <br />DRAINAGE STRUCTURES <br />SHEET <br />NO. <br />CROSS SECTIONS <br />CONVENTIONAL SIGNS <br />STATE Of WISCONSIN <br />STATE HIGHWAY COMMISSION OF <br />BEGINNING OF PROJECT S 0642(2) SEC. I <br />STATION 0+00 <br />EXCEPTION TO NET CENTERLINE LENGTH <br />STATION 51+96.8 TO STATION 52+32.8 <br />END OF PROJ. S 0642 (2) SEC. I STA. 69 + 666,-8 <br />BEGINNING OF PROJECT S 0455(1) _ <br />STATION 54+04.4 PROJECT - 0455(2) <br />END OF PROJECT S 0455 (I ) <br />BEGINNING OF PROJECT S 0642(2) SEC.2 <br />STATION 118 + 23.2 <br />END OF PROJECT S 0642(2) <br />STATION 131+27 <br />STATE LINE___ -_ - - =m � <br />CULVERTS IN PLACE._.._._.__.__r_====__�__� <br />CLASS AND AGREEMENT <br />COUNTY LINE ------------------------ s.=gym. <br />CULVERTS REQUIRED ____-______ <br />�--I <br />- r -� <br />TOWNSHIP OR RANGE LINE.__-.___ ._. ._. <br />DROP INLET -___------------------.�:___ <br />2.479 MI. <br />SECTIONLINE---------------------- <br />POWER POLE --------------------------------------i <br />1.313 <br />NEW RIGHT OF WAY LINE ---------- <br />TELEPHONE OR TELEGRAPH <br />POLE._____-__.___� <br />PRESENT RIGHT OF WAY LINE ...... _ — — — — - <br />RIGHT OF WAY MARKERS_ _ _ _ _ _ <br />_ _ _ <br />WIRE FENCE WOVEN ----------- —.—..._ <br />REFERENCE STAKE FOR HUBS <br />ONLY. _. 2s'- � • <br />BARBED ----------- —x—X—x— <br />MARSH ------------------------ <br />LOTLINE------•-----------------•---------------- <br />HEDGE ----------------------------^.. <br />,... -.^. <br />CORPORATE OR CITY LIMITS -6666//////////i///////// <br />TREES_.________-��� <br />------------------- <br />•� ; <br />~�" Vii.. <br />PROPERTY LINE.-_______ PL• +_ 32.6 <br />0, <br />TRAVELED WAY OR P. E ------------ ;._:________--" <br />GROUND ELEVATION... <br />DATUM LIN <br />RAILROADS-----------•-------•------ - <br />cD <br />BASE OR SURVEY LINE ------------ 30 <br />GRADE ELEVATION-_------ <br />DATUM LINE irl- <br />WISCONSIN <br />PLAN AND PROFILE OF PROPOSED <br />US H 12 - WESTPORT ROAD <br />C.T. H. M <br />.PROJECT S 0642(2) <br />MIDDLETON --WAUNAKFF ROAD <br />CTH M&Q <br />PROJECT S 04550) <br />DANE COUNTY <br />PLAN 1 IN. = 100 FT. <br />SCALES PROFILE HOR. IIN. = 100 FT. VERT. 1 IN. = 10 FT. <br />CROSS SECTIONS HOR. 1 IN. = 5 FT. VERT. 1 IN. = 5 FT. <br />15 14 I 13 18 ;:, p 17 ! 15 " I I 14 1 <br />13 <br />23 2�1 19 20 2 22 23 'gyp 24 <br />, <br />I M <br />I K , <br />CO 12 ASHTON K p <br />5 J 27 n 25 l a o <br />STAT k <br />34 I 3 6 31 I 3217,(� OS r� 6 <br />I <br />SP ILU TN. EST�ORT <br />TN. DLE N ITN AD ON <br />m! ( - <br />26163 ' 12669' ; ( MAFDE;F <br />a PHE T r t <br />' 3150 <br />8R _.I � <br />LAKE MEN DOTA <br />I ' r <br />�l UNIV. J <br />✓ i r <br />W I S. <br />15 13 O <br />SHORE.:. <br />IL <br />/ 10P <br />CITY OF MS <br />2-14 I MA ISON <br />22 23 24 1 19 71 <br />1 --- ,- - - '�- -- -- <br />R8E R.9 E. <br />LAYOUT <br />-W <br />FMA <br />L� <br />COUNTY <br />AND <br />HIGHWAY <br />0 <br />SCALE-- I' <br />CLASS AND AGREEMENT <br />WI <br />STATE <br />FEDERAL <br />TOTAL NET <br />LENGTH OF CENTERLINE = <br />2.479 MI. <br />PROJECT <br />S 0642 (21 'SECTION 1 <br />1.313 <br />PROJECT <br />S 0 642(2�ECTION 2 <br />0.247_ <br />PROJECT <br />S 0642(21 TOTAL <br />1.560 <br />PROJECT <br />S O4550) <br />0.919 <br />-W <br />FMA <br />L� <br />COUNTY <br />AND <br />HIGHWAY <br />ROUTE <br />AND <br />SECTION <br />CLASS AND AGREEMENT <br />WI <br />STATE <br />FEDERAL <br />13.6 <br />642.0 <br />11.2 <br />13.6 <br />455.0 <br />11.1 <br />4 11 <br />PLANS PREPARED <br />BY <br />i <br />ALEX W. ELY <br />DANE COUNTY SURVEYCH <br />DANE COUNTY HIGHWAY COMMISSION <br />RECOMMENDED FOR APPROVAL <br />DATES. <br />COUNTY HIGHWAY COMMISSIONER <br />STATE HIGHWAY <br />COMMISSION OF WISCONSIN <br />MADISON, WISCONSIN <br />' SURVEYOR DANE GO, NOTEBOOK L.Lu <br />DISTRICT COMPUTER AW.E• M. O. CHECKER <br />DISTRICT CHECKER W_A.. CORRECT <br />CORRECT: <br />DATE <br />DISTRICT ENGINEER <br />RECOMMENDED FOR APPROVAL: <br />DATE <br />ENGINEER OF DESIGN <br />APPROVED: <br />DATE <br />STATE HIGHWAY ENGINEER <br />DEPARTMENT OF COMMERCE <br />BUREAU OF PUBLIC ROADS <br />APPROVED: <br />DATE <br />DISTRICT ENGINEER <br />
The URL can be used to link to this page
Your browser does not support the video tag.