|
Help
|
About
|
Sign Out
Home
Browse
Search
CTHN-COTTAGE-GROVE-SUN-PRAIRIE_S0249(2)
DaneCounty-Planning
>
Clerical
>
Sam
>
Fricky
>
CDs Other
>
HWY Plans 10 Drawers
>
Hwy Plans N-O
>
CTHN-COTTAGE-GROVE-SUN-PRAIRIE_S0249(2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2025 12:42:42 PM
Creation date
3/7/2025 12:41:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e <br />MARKER POSTS FOR S <br />SPACING C. TO Com- VARIABLE <br />TO CONFORM TO RE50_1 i MEN <br />i. SHDWN ON PLANS OR AS <br />3,•_.�,DIRECTED BY THE ENGINEER <br />REFLECTOR <br />N <br />BUTTONS <br />�t <br />OF RDWY <br />/ <br />VHITE <br />'RIME <br />:OAT <br />FINISHEC <br />I <br />11 }n SURFA <br />�m <br />ELEVATION SHOWING SPACING ELEVATION SHOWING LOCATION <br />SPACING OF MARKER POSTS FOR VARYING LENGTHS ON ROAD SHOULDER <br />OF SHOULDER TO BE PROTECTEO - <br />100 FT. TO 500 FT. ------------------------ 50 FT <br />500 FT OR MORE ---------------------------100 FT <br />,SEE MISCELLANEOUS QUANTITY SHEET OF PLANS <br />TOP OF PAV'T <br />CULVERT <br />SECTION WITH CULVERT MARKER <br />PLAN SKETCH <br />CONSTRUCTION NOTES <br />REFLECTOR BUTTONS SHALL BE SIZE NO.ICRYSTAL,COM- <br />PLETE WITH CLIP FOR WOOD MOUNTING, DRILL MOUNTING HOLE <br />TO FIT BUTTON (GENERALLY T/g DIAMETER). <br />MARKER POST AS CULVERT MARKER TO BE PLACED AT <br />BOTH ENDS OF CULVERT ON NEAR SIDE OF CULVERT. NO RE- <br />FLECTOR BUTTON REQUIRED - <br />MARKER POSTS FOR RIGHT OFWAY <br />2 COATS <br />OF BLACK <br />I2 COATS _ <br />OF YELLOW WHITE <br />-1-7111111 <br />_ PRIME <br />i I CO AT <br />TTING AND PAINT <br />500 MAIC. <br />olCL <br />� A: <br />a <br />TYPICAL PLAN SHOWING LAYOUT OF `POSTS <br />CONSTRUCTION NOTES <br />RIGHT OF WAY MARKER POSTS SHALL BE ERECTED EGGE OF THE POST WILL BE TANGENT TO THE RiW <br />IN ADVANCE OF GRADING OPERATIONS. LINE OR LiNES EXTENDED. <br />POSTS MAY BE SHAPED AND PAINTED PRIOR TO THE EXACT LOCATION SHALL BE STAKED III THE <br />SETTING ANY DAMAGE TO PAINT SURFACE DURING FIELD BY THE ENGINEER. <br />ERECTION MUST BE TOUCHED UP BEFORE ACCEPT- <br />ANCE. <br />THE POSTS SHALL BE PLACED AT THE OUTER <br />LIMITS OF THE HIGHWAY BUT ENTIRELY WITHIN THE <br />RfW, AND SHALL BE SO PLACED THAT THE OUTER <br />GENERAL NOTES <br />DETAILS FOR THIS ITEM SHALL CONFORM TO THE PERTINENT <br />REQUIREMENTS OF THE STANDARD SPECIFICATIONS AND THE APPLICABLE <br />SPECIAL PROVISIONS. <br />MARKER POSTS <br />STATE HIGHWAY COMMISSION OF WISCONSIN <br />RECOMMENDED FOR APPROVAL: - <br />0ATE <br />ONSTRUC710N Er:GI`!_F0 <br />APPROVED <br />DATE <br />STATE HiGMWAr ENGINEEF. <br />DRAWN LJD <br />CHECKCO <br />7-103,1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.