Laserfiche WebLink
lktits For <br />larkers Only <br />Road Shoulder <br />Metal <br />Finished <br />ighwoy Shoulder Slope <br />Embankment <br />Location of <br />Culvert Under Culvert Marker Post <br />hi h ,a Embankment(Near Side) <br />Ground Line----- <br />SECT ION <br />SHOWING RELATIVE LOCATION OF <br />MARKER POST FOR CULVERTS <br />Lil <br />MARKER <br />MARKER POST FOR <br />ROAD SHOULDERS AND CULVERTS <br />4 <br />F9g. <br />LOCATION DIAGRAM <br />RIGHT OF WAY <br />SHOWING TYPICAL LOCATIONS OF <br />Danger Zone - Water, Canyon etc. <br />MARKER POSTS FOR RIGHT OF WAY <br />"P .. -,_,Culvert Marker Post <br />.�\ Placed at Near Side When Curve is Involved <br />iU Place Marker Past on PT. <br />Slops PT. orP.Gof Or FC of Curve (outside) <br />a Gntsrline \, MARKER POST FOR <br />Culverts <br />RIGHT OF WAY <br />Ifortz.Curve <br />\� <br />`� Road Shoulder <br />I Culvert Marker Post <br />�f Picesd atflear Side <br />1 <br />.` Rood Shoulder <br />Skewed Culvert�:> �. <br />' <br />� boulder <br />Culvert Morkn Post ` Marker Posts <br />Cuttror Nlprker <br />Post Placed <br />' <br />Plaeod at Near Side <br />of Noor Side <br />i GENERAL .NOTES <br />• -�.� <br />Fill <br />Slope Details of Construction not shown on this drawing shol I conform to the pertinent <br />requirements of the Standard Specifications and the <br />SPACING FOR <br />applicable Special Provisions, <br />SHOULDER MARKER POSTS <br />MARKER POSTS FOR RIGHT OF WAY <br />MARKER P' <br />50'C:C for K)0' to 500' Danger Zones <br />Right of Wdy Marker Posts shall be erected in advance of Grading Operations. <br />Posts be at the outer limits of the Highway Right of Way, <br />100 C:C for Over 500' Danger Zones <br />shall placed <br />but entirely within the Right of Way, and shall be so placed that the outer edge <br />MARKER POSTS FO <br />LOCATION DIAGRAM <br />of the pops shall be tangent to the Right of Way line or lines extended. The exact <br />RELATIVE LOCATIONS OF SHOULDER MARKER <br />POSTS <br />location of all Right of Way Posts will be staked in the field by the Engineer. <br />SHOWING <br />STAT£ H/GHWi4Y COMMIS <br />AND.CULVERT MARKER POSTS <br />$EFLECTOR UNITS <br />Reflector Units shall have plastic crystal Ions ?/S* in diameter. Unit assembly shall <br />RECOMMENDED FOR APPROVAL <br />be a minimum of 7/S in length. Reflector Units stall be furnished with flared expand- <br />ing metal clips for wood mounting. Units shall be mounted in tightest fit possible <br />and securely stayed in poste. Reflector Units shall be installed in Road Shoulder <br />)ATE <br />MARKER POETS R R AD SHOULD R AND <br />F <br />CULVERTS <br />Marker Poets only. <br />DAT . <br />