Laserfiche WebLink
3 <br />T <br />11-611 <br />i <br />Finished 1,13'1 <br />Shoulder Line`. <br />r LL <br />61-6° <br />S-II6,1 <br />flector Units For <br />wider Markers Only <br />J <br />in <br />Rood Shoulder <br />Metal <br />Finished <br />Shoulder Slope <br />—-------------- <br />F inished—Probable <br />_Finished'Probable riginal <br />Shoulder Slope Ground Line-- <br />SECTION <br />SHOWING RELATIVE LOCATION OF <br />MARKER POST FOR CULVERTS <br />MARKER POST FOR <br />ROAD SHOULDERS AND CULVERTS <br />Danger Zone- Water, Canyon etc. <br />...__Culvert Marker Post <br />Placed at Near Side When Curve is Involved <br />Fill Place Marker Post on PT D Centerline <br />%Slope PT or PC.of or PC.of Curve (outside) Culvert <br />eL� <br />Horiz.Curv' <br />Road Snoulder I <br />Skewed (L Culvert�a� � <br />u <br />Culvert Marker Post Shoulder Culvert Marker <br />Placed at Near Side Marker Posts Post Placed-\ <br />at Near Side <br />1 �Slo <br />Sb <br />SPACING FOR <br />SHOULDER MARKER POSTS <br />50'C.0 for 100' to 500' Danger Zones <br />100 C:C for Over 500' Danger Zones <br />LOCATION DIAGRAM <br />SHOWING RELATIVE LOCATIONS OF SHOULDER MARKER POSTS <br />AND CULVERT MARKER POSTS <br />MARKER POSTS FOR ROAD SHOULDERS AND CULVERTS <br />Location of <br />Culvert Marker Post <br />(Nem Side) <br />r <br />LOCATION DIAGRAM <br />SHOWING TYPICAL LOCATIONS OF <br />MARKER POSTS FOR RIGHT OF WAY <br />C <br />MARKER <br />POST <br />FOR <br />RIGHT OF WAY <br />MARKER POST FOR RIGHT OF WAY <br />Marker Post <br />at Near Side <br />�f GENERAL NOTES <br />Details of Construction not shown on this drawing shall conform to the pertinent <br />requirements of the Standard Specifications Sections 2523,4124 and 4125 and <br />1�Q¢ the applicable Special Provisions. <br />All posts for Road Shoulder Markers, Culvert Markers and Right of Way <br />Markers are identical except for Painting and Reflector Units. All Posts shall be <br />round and untreated and shall be either Northern White Cedar, Southern Yellow Pine, <br />Norway Pine, White Pine or Jack Pine. <br />MARKER POSTS FOR RIGHT OF WAY <br />Right of Way Marker Posts sholl be erected in advance of Grading Operations. Posts <br />may be shaped and painted prior to erection. Any damaged areas occurring to paint <br />surface during erection or other subsequent operations must be repainted prior to <br />acceptance. <br />Posts shall be placed at the outer limits of the Highway Right of Way, <br />but entirely within the Right of Way, and shall be so placed that the outer edge <br />of the posts shall be tangent to li,e Right of Way line or lines extended. The exact <br />location of all Right of Way Posts shall be staked in the field by the Engineer. <br />Reflector Units for Right of Way Marker Posts will not be required. <br />REFLECTOR UNITS <br />Reflector Units shall have plastic crystal lens 7/8° in diameter. Unit assembly shall <br />be o minimum of 7/8°in length. Reflector Units shall be furnished with flared expand- <br />ing metal clips for wood mounting. Units shall be mounted in tightest fit possible <br />and securely stayed in posts. Reflector Units shall be installed in Road Shoulder <br />Marker Posts only. <br />BID ITEMS <br />No. 2523-5 Marker Posts --------------------- Each <br />No. 2523-6 Marker Posts for Right of Way---- Each <br />