|
Help
|
About
|
Sign Out
Home
Browse
Search
CUP 02135
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
CUP 02135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2011 7:44:01 AM
Creation date
8/18/2010 2:37:41 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02135
Town
Vermont Township
Section Numbers
02
AccelaLink
DCPCUP-0000-02135
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />K. Fencing: Fencing is constructed to meet Dane County <br />Standards to control access and promote a safety barrier for <br />adjoining lands. <br />L. Erosion Control: Erosion control will be achieved with the use <br />of silt fencing and stone water breaks wherever necessary <br />during operation. These erosion control methods will be <br />closely monitored and adjustments will be made as necessary <br />(see-enclosed plan). <br />M. Restoration Plan: The restoration plan for this quarry is on file <br />with Dane County and conforms to the mandates of NR 135 <br />that is administered by the Wisconsin Department of Natural <br />Resources. <br /> <br />Conclusion: Legitimate concerns regarding quarry operations usually center on the <br />issues of the environment, and the safety of all of those in the immediate <br />vicinity of the quarry. Yahara Materials, Inc. has a 20 year record of <br />safety and environmental responsibility in its operations at this site. <br /> <br />Yahara Materials, Inc. is an aggregate producer is in the most highly <br />regulated industry in the state. We conduct our operations well within <br />these regulations and with particular regard to the concerns of the <br />neighbors about blasting, noise, and dust. Our carefully designed <br />operation and reclamation plans would assure that all concerns are met. <br /> <br />Respectfully submitted <br /> <br />Timothy Geoghegan <br />
The URL can be used to link to this page
Your browser does not support the video tag.