|
Help
|
About
|
Sign Out
Home
Browse
Search
CUP 02135
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
CUP 02135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2011 7:44:01 AM
Creation date
8/18/2010 2:37:41 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02135
Town
Vermont Township
Section Numbers
02
AccelaLink
DCPCUP-0000-02135
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Reclamation <br />Plan Norslien <br />Page 3 <br /> <br />Criteria for Successful Reclamation <br /> <br />Percent cover of vegetation will determine successful reclamation. <br />Randomly selected sample sites (square meter sections, two per acre) <br />will be employed. Sampling will be conducted during peak growing <br />periods and will compare sample sites to vegetation cover of undisturbed <br />soils in neighboring area. A minimum of 70 percent vegetation <br />(determined by visual cOlmt) or equal to percent cover of similarly <br />vegetated areas in undisturbed location will qualify as successfully <br />reclaimed. Annual site inspection will be performed to ensme standards <br />for revegetation and reclamation are followed. If Dane County <br />recommends grading and/or seeding remedial /repair measures or <br />additional erosion control, they will be implemented and later re- <br />evaluated to accomplish successful revegetation and reclamation of the <br />site. <br /> <br />4. Drainage: <br />Currently the sites drainage pattern is- self contained within the quarry <br />area. Final restoration will allow for the site to be free draining in a <br />southerly direction. Clear stone weepers, erosion control and drain- <br />age structures, as need be will be used to accomplish the fmal <br />drainage pattern. <br /> <br />5. Phasing: <br />Due to the nature of this site a phasing plan in not practical. As the <br />deposit is depleted reclamation will begin as soon as possible, and <br />be completed in a timely fashion. <br /> <br />6. Fencing: <br />Currently there is a farm fence on two sides of the property. This <br />fencing will be maintained, and additional fencing will be added <br />to the Property to protect the public. <br />
The URL can be used to link to this page
Your browser does not support the video tag.