|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2014-00751
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2014
>
DCPZP-2014-00751
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2014 11:00:39 AM
Creation date
12/26/2014 2:42:01 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2014-00751
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
% <br /> 40 <br /> '� Public Health <br /> MADISON & DANE COUNTY Janel Heinrich,MPH,MA,Director <br /> Healthy people arid pla es Environmental Health Division <br /> 2701 International Lane,Suite 204 608 242-6515 Well&Septic <br /> Madison,W 53704 608 243-0330 Lic.Establishments <br /> 608 242-6435 fax <br /> www.publichealthmdc.com <br /> October 01, 2014 Plan Review ID: 13-2014-00313 <br /> PAUL HARDY <br /> 7226 TIMBERWOOD DR <br /> MADISON, WI 53719 <br /> Reference: Tax Parcel No:0708-301-6634-0 <br /> SE 1/4 of NE 1/4 of Section 30, <br /> Property Address: <br /> Subdivision:CHERRYWOOD FOREST, Lot:4 <br /> Owner Name:Acker Realty Llc <br /> Conditional approval for 750 gpd Split cell mound>24"granted. Plan approval expires October 1, <br /> 2016. <br /> Dear Paul Hardy: <br /> The submittal described above has been reviewed for conformance with applicable Wisconsin <br /> Administrative Codes, Wisconsin Statute and Dane County code ch. 46. The submittal has been <br /> CONDITIONALLY APPROVED. The owner, as defined in chapter 101.01 (10), Wisconsin <br /> Statutes, is responsible for compliance with all code requirements. <br /> The following conditions shall be met during construction or installation and prior to occupancy or <br /> use: <br /> New Split Cell Mound with 11"sand, 0.4 loading rate, 750 gpd. <br /> This system is to be constructed and located in accordance with the enclosed approved <br /> plans and with the following manuals: Mound Component Manual Version 2.0 SBD- <br /> 10691-P(N.01/01). <br /> In the event this soil absorption system or any of its component parts malfunctions so <br /> as to create a health hazard, the property owner must follow the contingency plan as <br /> described in the approved plans. In addition, the owner must comply with the operation, <br /> maintenance and monitoring duties as described in section VIII of the component <br /> manual. A copy of this information must be given to the owner upon completion of the <br /> project. <br /> A Sanitary Permit must be obtained from Public Health Madison and Dane County <br /> where this project is located. <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.