|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2014-00751
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2014
>
DCPZP-2014-00751
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2014 11:00:39 AM
Creation date
12/26/2014 2:42:01 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2014-00751
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
October 01, 2014 Plan Review ID: 13-2014-00313 <br /> Maintenance information must be given to the owner of the tank explaining that periodic <br /> cleaning of the filter is required.Access to the filter for cleaning must be provided per <br /> Comm 84 product approval conditions. <br /> A copy of the approved plans, specifications and this letter shall be on-site during construction <br /> and open to inspection by authorized representatives of Public Health Madison and Dane <br /> County. All permits required by the county or the state shall be obtained prior to <br /> commencement of construction/installation /operation. In granting this approval, Public Health <br /> Madison and Dane County reserves the right to require changes or additions should conditions <br /> arise making them necessary for code compliance. As per state statutes 1-01.12(2), nothing in <br /> this review shall relieve the designer of the responsibility for designing safe components. If you <br /> have any questions, please feel free to contact me at 242-6515. <br /> Sincerely, <br /> James Meyerhofer <br /> Sanitarian <br /> Public Health Madison and Dane County <br /> Environmental Health Division <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.