|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2014-02300
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2014
>
DCPCUP-2014-02300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2015 3:40:01 PM
Creation date
5/4/2015 3:39:52 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02300
Town
Cottage Grove Township
Section Numbers
28
AccelaLink
DCPCUP-2014-02300
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2561 Coffeytown Road <br /> R.G. 1-USTON COMPANY, Cottage Grover Wisconsin 53527 <br /> 608-255-9223 <br /> FAX:608-839.5936 <br /> December 9,2014 <br /> Dane County Planning and Development <br /> City-County Building,Room 116 <br /> 210 Martin Luther King Jr.Blvd. <br /> Madison,WI 53709 <br /> Attn: Dan Everson,Zoning Inspector <br /> RE: Addendum#1 <br /> Conditional Use Application for Mineral Extraction Site <br /> (i.e.Time extension for existing CUP#2136-Skaar Pit in Town of Cottage Grove) <br /> Dan: <br /> Thank you for reviewing our submittal. The answers to your questions are as follows: <br /> • 10.191(2)2(c)3—Approximate depth to ground water is the existing/proposed <br /> permanent pond water elevation as shown on Existing Contour Map and Reclamation <br /> Plan(in original submittals). <br /> • I0.191(2)2(c)4—Materials to be extracted would/could be sand,gravel, sandstone, <br /> limestone,clay,topsoil,etc.—amounts will vary on demand. <br /> • 10.191(2)2(c)8—Haul routes will continue to be out the northeast corner of the property <br /> on the existing asphalt paved entrance onto Natvig Road(see existing Operations map) <br /> then directly east to CTH `N'. This portion of Natvig Road has been previously <br /> reconstructed to highway standards through a joint effort of RG Huston Company,Dane <br /> County and the Town of Cottage Grove. <br /> • 10.191(2)2(c)9—Since this has been an existing operation for quite a few years,we are <br /> entering the final phase of the operation which is the final mining of the southern-most <br /> portion of the remaining property. <br /> • 10.191(2)2(c)10—The proposed equipment for extraction and processing of material on- <br /> site will remain the same as it has been in the past with loaders,dozers,backhoes, <br /> crushers,screeners,wash plants,haul trucks,dump trucks,etc. This equipment will be <br /> used as demands for product require. <br /> • 10.191(2)2(c)l l —Frequency of mining,crushing,screening,washing,refueling will be <br /> performed as demand warrants—varies greatly but will not be a constant every day, <br /> every week for every month operation. Drilling and blasting will be a rare occurrence <br /> and will require us to apply for and get approval of a blasting permit from the Town of <br /> Cottage Grove. Bulk fuel will not be stored on site. Asphalt or Concrete batch plants <br /> are not planned at this time and if the need arises in the future,will require a separate <br /> conditional use permit. <br /> • 10.191(2)2(c)12—It is our intent at this time to remain above the water table with the <br /> remaining mineral extraction. We may need to deepen and widen the existing on-site <br /> detention pond that we created to accommodate the needs of the proposed reclamation <br /> uses of the property. If that occurs,we keep our excavation equipment out of the water <br /> (except for the bucket/boom arm of the backhoe). We will require fueling and <br /> AN I:QUA! oil)(W.I UN!14` E ttt['hOyj.j. <br />
The URL can be used to link to this page
Your browser does not support the video tag.