maintenance of the equipment to occur away from the open water and protected from <br /> possible spillage/run-off. <br /> • 10.191(2)2(c)13—We will continue to use the existing portable scale and portable scale <br /> shack located in its current location. <br /> • 10.191(2)2(c)14—The existing mineral extraction operation is internally drained. <br /> Existing drainage is directed to the on-site detention pond. The entrance is paved quite a <br /> distance into the property and will continue to be maintained as needed by sweeping <br /> clean and/or watering. Internal haul roads will also be maintained as needed by either <br /> use of water or a combination of water and calcium chloride application. <br /> • 10.191(2)2(c)15—Proposed use of land after reclamation will be either commercial or <br /> agricultural consistent with the Town of Cottage Grove's Future Land Use Plan(in <br /> original submittals)and consistent with the property's current zoning. <br /> • 10.191(2)2(d)6—Additional areal map now included showing surrounding properties <br /> within 1000' of the mineral extraction property(see attached). <br /> • 10.191(2)2(d)9—See answer to 10.191(2)2(c)9. <br /> • 10.191(2)2(d)10—The existing driveway is currently gated at Natvig Road entrance <br /> location. The property has existing right-of-way fencing along the eastern portion of the <br /> adjacent CTH'N' ROW and along the southern portion of the adjacent 12/18 ROW that <br /> will continue to be utilized(see attached revised Existing Operations Map depicting <br /> these areas).No other portions of the property are currently fenced or will be fenced. <br /> • 10.191(2)2(d)11 —Stockpile locations-see attached revised Existing Operations Map. <br /> • 10.191(2)2(d)12—There is an existing screening berm that was established along the <br /> north side of the existing entrance driveway. This berm will be left in place. <br /> • 10.191(2)2(d)13 -We will continue to use the existing portable scale and portable scale <br /> shack located in its current location(see attached revised Existing Operations Map). <br /> • 10.191(2)2(d)14—Existing signage will remain in place including all MSHA required <br /> operation signs,no trespassing signs,RG Huston Company signs,etc. <br /> • 10.1 91(2)2(f)—existing County and Township approved Reclamation Plan in original <br /> submittals. <br /> • 10.191(3)—All excavations are located outside of the current highway right of ways and <br /> setbacks are according to required standards. <br /> • 10.191(4)—Topsoil and overburden stockpiles are located on the northern portion of the <br /> property from the stripping of the original phasing. These piles will be used to reclaim <br /> the site per the Reclamation Plan in the original submittals. <br /> If any additional information is needed,please call our office. Thank you for your time and <br /> attention to this matter. <br /> gicerely, <br /> ►,ennis Richardson,PE <br /> Sr.Engineer.Safeny Director/EEO-AA Officer <br />