Laserfiche WebLink
Development Densities and Ratios <br /> 34.51 Units per Acre <br /> Building Coverage: 24% <br /> Open/Green Space Ratio: 11% <br /> Floor Area Ratio: 1.25 <br /> Hard Surface: 65% <br /> Signage <br /> Signage is a key consideration for the use of PUD zoning for this project because tenants will likely <br /> require signage that would not comply in C-2 or R-4 zoning as those zoning designations were not <br /> created with this type of multi-tenant mixed-use building in mind. <br /> Signage areas are indicated on the enclosed elevation plans. The attached plan shows the maximum <br /> signage area. The wall-mounted "Tenant Signs" will be no more than 18 inches tall and the wall- <br /> mounted "Commercial Tenant or Residential Signage Area" (three areas) will be no more than 30 inches <br /> tall. All building mounted signage will be internally illuminated individual cut out letters, with the font <br /> being of the tenant's choice. The intent is to allow each commercial tenant to have a building mounted <br /> sign on up to two different exterior faces of the building. If requested by the Tenant and approved by <br /> the Landlord,the Tenant shall also have the option to add a blade sign. <br /> A 4-foot by 8-foot monument sign is proposed at the corner of Rimrock Road and Novation Parkway. <br /> The lettering will be up to 6 inches for the building, and up to 4 inches for the tenants. In addition, <br /> leasing information will be provided on the sign with up to 4 inch lettering. A wayfinding sign no larger <br /> than 4-feet by 8-feet will be located at the parking lot entrance off of Novation Parkway. A sign located <br /> at the front residential entrance no larger than 6-feet by 6-feet will be allowed for the building address <br /> and leasing information. <br /> Relationship to the Approved Town Land Use Plan <br /> ., ED T t <br /> . -c FEW C <br /> ._ <br /> The Town Land Use Plan from June 1978 is dated and was not adopted by Dane County C (Iv `T N,Av, Soti <br /> c�+�s <br /> Projected Timeline p <br /> GDP Approval: May 2014 <br /> SIP Approval: May/June 2014 <br /> Construction Start: May/June 2014 <br /> Construction Complete: November 2014 <br />