|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2009-00691
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2009
>
DCPZP-2009-00691
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2015 11:33:46 AM
Creation date
10/14/2015 8:45:33 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2009-00691
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> $2000.00, the permit holder will pay the amount exceeding $2000.00. <br /> 12. Zoning permits and Building Permits cannot be issued until the culvert is <br /> installed. <br /> Title 4, Public Works and Safety <br /> Chapter 4 <br /> Driveway Permits and Specifications <br /> Section 4-4-1: Permit Required <br /> (1) No person shall establish or construct a driveway, highway, or <br /> other access, from any parcel to any highway required to be <br /> maintained by the town, without first applying for, and receiving a <br /> driveway permit from the Town Board or its designee (highway <br /> patrolman). An approved driveway entrance shall be in place <br /> before a building permit shall be issued. <br /> (2) The highway patrolman shall approve or reject the location and <br /> specifications of the driveway following a review of the application <br /> and the on-site conditions, based on the Dane County driveway <br /> siting criteria in effect on the date of application, the provisions of <br /> this ordinance, and his or her judgment. <br /> (a) The applicant may appeal the decision of the highway <br /> patrolman to the town board, at a regularly scheduled board <br /> meeting. The board shall make a final decision only after <br /> having viewed the on-site conditions, and hearing any testimony <br /> presented. <br /> (3) An applicant for a driveway permit associated with residential or <br /> commercial development on a town road shall escrow $2050.00 <br /> with the Town business office. The intent of this escrow amount is <br /> to hold the owner responsible for potential damage by construction <br /> equipment. If at the time of the issuance of the occupancy permit <br /> by the building inspector there is no damage to the town road, <br /> $2000.00 of the escrowed money shall be returned to the <br /> applicant. If, in the estimation of the highway patrolman, there is <br /> damage to the road, the road will be fixed and the cost shall be <br /> deducted from the $2000.00 escrow. The remainder, $50.00, will <br /> be retained by the Town for administrative fees for the issuance <br /> and inspection process. If the cost of repair of the damage to the <br /> road exceeds $2000, the permit holder shall pay to the Town all <br /> amounts in excess of$2000. <br /> (a) Field access permit holders do not need to escrow $2000.00. <br /> A $50.00 fee shall be paid at the time of the application <br />
The URL can be used to link to this page
Your browser does not support the video tag.