Laserfiche WebLink
f ` <br /> ,; Land Conservation Division <br /> v ; Dane County Land &Water Resources Department <br /> (4st g_ ` Patrick J.Sutter,County Conservationist <br /> DATE: September 25, 2009 <br /> TO: John& Sally Bertelson <br /> Owner <br /> FROM: Jason Tuggle <br /> Erosion Control Specialist <br /> RE: Bertelson Residential Site-Erosion Control Plan,EC2009-0221 <br /> The submitted erosion control plan meets the needs of the site. The plan includes the following <br /> requirements: <br /> 1. The project will be accessed from Keenan Road using a stone tracking pad. The pad will <br /> be a minimum of 50'1 x 24'w x 12"d and be constructed of 3" clear stone. Any material <br /> deposited in the roadway must be cleaned up throughout and at the end of each workday. <br /> 2. Silt fence or silt sock(12"diameter)must be installed prior to grading in the locations <br /> shown on the plan and where deemed necessary, including down slope of all soil <br /> stockpiles. The silt fence must be maintained until the site has been vegetated and <br /> stabilized. <br /> 3. Grading must be confined to the areas shown on the plan. No material storage, vehicle <br /> traffic or grading may occur in the areas identified as"undisturbed" or"vegetated buffer" <br /> on the plan. In the event any of these areas are disturbed, additional erosion control <br /> measures will be required. <br /> 4. The plan includes a construction schedule as follows: <br /> Grading and construction is scheduled to begin September 28, 2009. <br /> Critical slopes identified in the plan must be temporarily stabilized as described in <br /> the plan by November 30,2009. <br /> All disturbed areas on site must be restored with permanent seed and mulch by <br /> June 15, 2010. <br /> Lyman F.Anderson Agriculture&Conservation Center <br /> 1 Fen Oak Court,Room 208,Madison,Wisconsin 53718-8812-PH:608/224-3730,FAX:608/224-3745 <br /> www.countyofdane.com/landconservation <br />