|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2009-00664
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2009
>
DCPZP-2009-00664
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2015 3:43:12 PM
Creation date
10/15/2015 3:43:10 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2009-00664
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CERTIFIED SURVEY REQUIRED <br /> The above listed description/s is/are intended to describe land for which a certified survey map will <br /> be prepared for approval and recorded. This amendment will become effective, if within 90 days of <br /> its approval by Dane County, a certified survey map that describes the land to be rezoned is <br /> recorded in the office of the Dane County Register of Deeds. Failure to record the survey will <br /> cause the rezone to be null and void. Two copies of the recorded survey shall be submitted to <br /> Dane County Zoning. <br /> Effective: / _ / t_ <br /> The L)ane County Board of Supervisors does ordain that 1:312$ 12Ttc71d2T ent,based upon"I heir findings; to be i:(ztls2>l£`2l( <br /> with the provisions of W iseon.s€n St.it'. Statute 91.7 (1)(a),(b).(c). <br />
The URL can be used to link to this page
Your browser does not support the video tag.