Laserfiche WebLink
03/16/1998 11:07 608-267-1540 DANE CTY ZONING PAGE 83 <br /> Brush is also collected,and will be chipped at the Recycle Center. These wood ps <br /> cover the site. The wood chips can also be picked up by City residents for their uuse will be used to <br /> won&M intance Manual. A operation and maintenance manual will be kept at the site in the <br /> attendant's building. The manual will explain procedures to be followed <br /> as well as procedures in the event of a spill. Procedures for handing material during n he site operations ot in <br /> operation will also be included in the manual. The manual will list the phone numbers of emergency <br /> personnel and responsible parties. <br /> h&c The site will be fenced and buffered with trees/shrubs on the west side along the park,on the <br /> north side along the driveway, and on the east side behind the landscaping contractor. The site is <br /> inaccessible from the south. <br /> ' in io • Erosion control during construction will consist of installing a <br /> graver pad in the southeast corner of the site,and using silt fence,bales,or mulch to <br /> which washes off the sides of the fill (existing site fill)from washing into the wetland or prevent soil <br /> 3 e <br />