|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01525
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01525
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 12:14:08 PM
Creation date
10/23/2015 11:59:37 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01525
Town
Dane Township
Section Numbers
28
AccelaLink
DCPCUP-0000-01525
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MADISON SAND & GRAVEL COMPANY, Inc. <br /> Washed Sand & Gravel — Fill Sand & Dirt — Limestone — Trucking <br /> Telephone(608) 244-6726 or(608) 846-4333 <br /> 5349 Norway Grove School Road, DeForest, Wisconsin 53532 <br /> William & Diane Wipperfurth <br /> 6755 County Trunk "P" <br /> Dane, WI 53529 <br /> (608) 849-5368 <br /> Additional Information for Application for CUP <br /> 1 . It is our assumption that a gate at the entrance of the <br /> proposed pit is not necessary. The entrance to the pit is <br /> also the Wipperfurth' s driveway. The driveway/entrance goes <br /> past the Wipperfurth' s home . We will have no problems putting <br /> up any "No Trespassing or Danger" signs . <br /> 2 . Because of the location of the pit in proximity to the <br /> Wipperfurths dwelling, we feel the an encompassing fence <br /> would not be necessary. We will also be sloping the excavated <br /> area at a ratio of 3 : 1 , which greatly diminishes the <br /> possibility for any type of accident . The bank where the <br /> material will be loaded from is only an estimated 30 ' wide . <br /> The material being extracted will consist of approximately 60% <br /> sand and 40% gravel . <br /> 3 . Because we will be leaving the loader at the pit we will have <br /> the need for a diesel fuel tank. The tank will be a <br /> temporary tank no larger than 500 gallons . The approved <br /> tank will supplied and filled by Danco Prairie FS . There <br /> would be no spill containment required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.