|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00851
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00851
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2015 3:54:52 PM
Creation date
10/23/2015 3:23:56 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00851
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9/1/2015 BREUNIG,HERB <br /> CL AY Verona,WI 53593-0220 Doc ID:896502015 90 0 1056 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> ClearyBuilding.com Fax: (608)845-7070 Cleary/Owner Project Proposal - Erected <br /> Truss Type <br /> Note:Clearance may be reduced by finished floor height. <br /> Roof Pitch: 4/12 <br /> Roof Peak Height: IMP <br /> "A" = Actual Eave Height: <br /> U "B" = Truss clearance at heel: 11' 0" <br /> CC 4 (Truss clearance = 1'-0" less than nominal eave height, in most cases. <br /> 1oo+0" k If nested purlins are used truss clearance will be increased by 4".) <br /> Raised Lower Chord Truss(RLC) "C" = Truss clearance at center: 13' 1" <br /> (Truss clearance at the center of the bulding with an RLC truss will be <br /> greater than the clearance at the heel.) See page PL-6 in the price <br /> book for clearances. <br /> Overhead Frameout & Headroom <br /> "D" = Bottom elevation (B.E.)of overhead door: 0' 0" <br /> The bottom of all overhead doors(top of finished floor)are <br /> recommended to be placed at 4" above the 100'-0" mark(100'-4"). In <br /> building without paved floors, B.E.of doors may be lower-e.g. 100'- <br /> 0â <br /> "E" = Height of overhead door: 10'0" <br /> lam, <br /> Overhead door height = the height of the overhead door being placed <br /> in this building. <br /> "F" = Available headroom: 1' 2" <br /> Available headroom = the space available for overhead door tracks <br /> and openers. If a ceiling is installed, headroom will be reduced by <br /> about 1". Door headroom requirements must be confirmed with the <br /> door supplier. <br /> l,_ , , Headroom calculation formula: <br /> CB") CD") ("E") _ (âFâ) <br /> (Truss Clearance) - (B.E. of overhead door)- (Overhead door height) = <br /> (Available headroom) <br /> Example: <br /> (10'-0") -(4")- (8'-0") = (1'-8"of available headroom) <br /> v12;0 built with pride before the is applied "' 12 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.